I-11
8.10
Warm-up Time
When nominal voltage (115/230V) is applied, ready temperature (Fuser Stand-by) is
reached within 30 seconds after command is given by the controller.
Reference: Measured at 22°C, 55% RH, nominal voltage.
8.11
FPOT (First Print Output Time)
FPOT time of the printer is shown in the table below.
The time required for the first sheet of paper to be delivered after the START command
is given is calculated on the following conditions (rounded to one decimal place).
•
IOT performance that the controller does not have IOT wait.
•
This value is indicated by either of two described below depending on the
status of Motor On and Fuser.
1. Scanner RDY t
on
: Scanner Motor Ready (steady-status rotation) and
Fuser Ready
2. Scanner OFF t
off
: Scanner Motor Off (at stopping) and Fuser Ready
temperature
•
Paper is A4 SEF
•
Except when process control is operating*1 / when Fuser Cool down*2
•
Paper mode is plain paper mode.
•
Paper feeding is Tray1 (paper tray which locates at the bottom of the printer)
•
Measurement environment is at 22 °C / 55%RH rated voltage.
*1: Process controller operation is process controls such as TC control, electric potential
control, cleaning cycle, registration control, and so on. Sometimes, the engine stops
feeding papers for a certain period of time while continuous printing for these
operations.
*2: The print may not start for a certain time after receiving the start command due to
prior job running conditions.
FPOT(sec)
In Simplex mode
In Duplex mode
Process
speed
Scanner RDY t
on
Scanner OFF t
off
Scanner RDY t
on
Scanner OFF t
off
Full speed
8.0
14.0
13.5
19.5
Half speed
14.5
20.5
24.5
30.5
FPOT of paper fed from trays other than is added following values to above Scanner
RDY t
on
and Scanner OFF t
off
.
Process speed
MSI
Option Feeder Unit (Tray2) *3
Option Feeder Unit(Tray3) *4
Full speed
-0.3 sec
+0.9 sec
+1.8 sec
Half speed
-0.6 sec
+1.8 sec
+3.5 sec
*3: Tray2 : First tray of option Feeder
*4: Tray3 : Second tray of option Feeder
Содержание HL-4200CN
Страница 21: ...CHAPTER I SPECIFICATIONS ...
Страница 42: ...CHAPTER II INSTALLATION ...
Страница 54: ...II 11 12 Close the front cover Fig 2 27 ...
Страница 62: ...CHAPTER III STRUCTURE OF SYSTEM COMPONENTS ...
Страница 98: ...III 34 5 7 2 Reference diagram Transfer Roll Cartridge ASSY FUSER ASSY Exit Sensor FAN FUSER Fig 3 40 ...
Страница 115: ...CHAPTER IV ASSEMBLY DISASSEMBLY ...
Страница 166: ... IV 48 Magenta Fig 4 86 Cyan Fig 4 87 Holder toner cartridge ASSY 2 Holder toner cartridge ASSY 3 ...
Страница 167: ... IV 49 Black Fig 4 88 Holder toner cartridge ASSY 4 ...
Страница 204: ...CHAPTER V TROUBLESHOOTING ...
Страница 279: ...V 73 10 IMAGE QUALITY SPECIFICATIONS 10 1 Parallelism Fig 5 13 10 2 Diagonal Fig 5 14 10 3 Skew Fig 5 15 ...
Страница 280: ...V 74 10 4 Straightness Fig 5 16 10 5 Magnification Error Fig 5 17 10 6 Registration Fig 5 18 ...
Страница 281: ...V 75 10 7 Guaranteed Printing Area Fig 5 19 ...
Страница 297: ...CHAPTER VI DIAGRAMS ...
Страница 341: ...CHAPTER VII PLUG JACK P J CONNECTOR LOCATIONS ...
Страница 342: ...CONTENTS CHAPTER VII PLUG JACK P J CONNECTOR LOCATIONS VII 1 1 LIST OF P J VII 1 2 P J LAYOUT DIAGRAM VII 4 ...
Страница 346: ...VII 4 2 P J LAYOUT DIAGRAM ...
Страница 347: ...VII 5 ...
Страница 348: ...VII 6 ...
Страница 349: ...VII 7 ...
Страница 350: ...APPENDIX ...
Страница 359: ...The actual life is over than catalog specification But as you may know we are including some margin ...