Chapter 1 Preparation of Embroidery Machine
BES-941BC • BES-1241BC
22
When using a crane
Place two rectangular bars on the four L-shaped steels on the bottom of the machine steel
frame. Loop four ropes around the bars and lift the machine.
Note) When lifting the machine, make sure that the ropes do not contact the machine table or the tension plate.
Rope
L-shaped steel
Rectangular bar
Содержание BES-1241BC
Страница 7: ...5 BES 941BC BES 1241BC 2 1 7 1 6 3 4 5 7 3 2 Belt cover Finger guard BES 941BC ...
Страница 13: ...11 BES 941BC BES 1241BC Setting of thread breakage sensor page 94 Setting of Machine page 97 ...
Страница 18: ...16 BES 941BC BES 1241BC ...
Страница 19: ...Chapter 1 Preparation of Embroidery Machine ...
Страница 50: ...Chapter 1 Preparation of Embroidery Machine BES 941BC BES 1241BC 48 ...
Страница 60: ...BES 941BC BES 1241BC 58 Chapter 2 Embroidering Procedures ...
Страница 125: ...Chapter 6 Operation of Machine ...
Страница 136: ...Chapter 6 Operation of Machine BES 941BC BES 1241BC 134 ...
Страница 137: ...Chapter 7 Maintenance ...
Страница 148: ...Chapter 7 Maintenance BES 941BC BES 1241BC 146 ...
Страница 149: ...Chapter 8 Standard Adjustment ...
Страница 161: ...Chapter 9 List of Error Messages ...
Страница 166: ...BES 941BC BES 1241BC 164 Chapter 9 List of Error Messages ...
Страница 179: ...Connection and Installation of Optional Equipment ...
Страница 182: ...INSTRUCTION MANUAL BROTHER INDUSTRIES LTD NAGOYA JAPAN Printed in Japan 155 941 C41 S93941 002 1999 09 H 1 ...