Chapter 6 Operation of Machine
BES-941BC • BES-1241BC
124
1. Operating Procedures
1-1 Power Source
1.
Turn the power on to the machine.
2.
Reset the emergency stop button.
3.
Press the power switch.
4.
A message is displayed on the LCD.
• The alarm sounds three times and the
needle bar and the presser foot move
upward. Then the hoop moves to the zero
point and the sewing data screen is
displayed.
Note) When turning the power off and back it on
again, wait for at least 10 seconds.
1-2 Preparation for Embroidering
• Select embroidering data.
• Using the jog switches (
), determine a position to start embroidering.
Note) An error message is displayed on the LCD if a pattern comes out of the hoop.
• Pressing
starts embroidering.
• After embroidering is finished, the machine is placed in the stand-by state.
Emergency stop switch
Power switch
Содержание BES-1241BC
Страница 7: ...5 BES 941BC BES 1241BC 2 1 7 1 6 3 4 5 7 3 2 Belt cover Finger guard BES 941BC ...
Страница 13: ...11 BES 941BC BES 1241BC Setting of thread breakage sensor page 94 Setting of Machine page 97 ...
Страница 18: ...16 BES 941BC BES 1241BC ...
Страница 19: ...Chapter 1 Preparation of Embroidery Machine ...
Страница 50: ...Chapter 1 Preparation of Embroidery Machine BES 941BC BES 1241BC 48 ...
Страница 60: ...BES 941BC BES 1241BC 58 Chapter 2 Embroidering Procedures ...
Страница 125: ...Chapter 6 Operation of Machine ...
Страница 136: ...Chapter 6 Operation of Machine BES 941BC BES 1241BC 134 ...
Страница 137: ...Chapter 7 Maintenance ...
Страница 148: ...Chapter 7 Maintenance BES 941BC BES 1241BC 146 ...
Страница 149: ...Chapter 8 Standard Adjustment ...
Страница 161: ...Chapter 9 List of Error Messages ...
Страница 166: ...BES 941BC BES 1241BC 164 Chapter 9 List of Error Messages ...
Страница 179: ...Connection and Installation of Optional Equipment ...
Страница 182: ...INSTRUCTION MANUAL BROTHER INDUSTRIES LTD NAGOYA JAPAN Printed in Japan 155 941 C41 S93941 002 1999 09 H 1 ...