Chapter 7 Maintenance
BES-941BC • BES-1241BC
138
BES-941BC
Lubricate the following part indicated by the arrow ("clearance" between the connecting rod
and the needle thread take-up bearing) once a week.
(Note) • In lubrication, select needle bar 9 and remove arm cover L to check the lubrication area. Be sure to wipe
off excessive oil spilt at the lower part of the arm.
Connecting
rod
Arm cover L
Connecting rod
BES-1241BC
Lubricate the following part indicated by the arrow ("clearance" between the connecting rod
and the needle thread take-up bearing) once a week.
(Note) • In lubrication, select needle bar 12 and remove the head cover to check the lubrication area. Be sure to
wipe off excessive oil spilt at the lower part of the arm.
Connecting
rod
Head cover
Thread take-up bush
Connecting rod
Thread take-up bush
Содержание BES-1241BC
Страница 7: ...5 BES 941BC BES 1241BC 2 1 7 1 6 3 4 5 7 3 2 Belt cover Finger guard BES 941BC ...
Страница 13: ...11 BES 941BC BES 1241BC Setting of thread breakage sensor page 94 Setting of Machine page 97 ...
Страница 18: ...16 BES 941BC BES 1241BC ...
Страница 19: ...Chapter 1 Preparation of Embroidery Machine ...
Страница 50: ...Chapter 1 Preparation of Embroidery Machine BES 941BC BES 1241BC 48 ...
Страница 60: ...BES 941BC BES 1241BC 58 Chapter 2 Embroidering Procedures ...
Страница 125: ...Chapter 6 Operation of Machine ...
Страница 136: ...Chapter 6 Operation of Machine BES 941BC BES 1241BC 134 ...
Страница 137: ...Chapter 7 Maintenance ...
Страница 148: ...Chapter 7 Maintenance BES 941BC BES 1241BC 146 ...
Страница 149: ...Chapter 8 Standard Adjustment ...
Страница 161: ...Chapter 9 List of Error Messages ...
Страница 166: ...BES 941BC BES 1241BC 164 Chapter 9 List of Error Messages ...
Страница 179: ...Connection and Installation of Optional Equipment ...
Страница 182: ...INSTRUCTION MANUAL BROTHER INDUSTRIES LTD NAGOYA JAPAN Printed in Japan 155 941 C41 S93941 002 1999 09 H 1 ...