2. PREPARATION
2-13.
―
11
―
BAS-705
・
Sewing data such as the bobbin thread counter and production counter settings are stored in a
memory which has a battery backup.
・
If the power is not turned on for a long period of time (approximately three weeks or more), the
contents of the battery backup memory may become corrupted, causing the error code "E-160" to
appear on the display when the machine is turned on.
If this happens, initialize the sewing data by following the procedure below.
Initializing the sewing data
1. Turn off the power switch.
2. Open the control box cover and set DIP switch No. 4
on the main circuit board to ON.
(Refer to "8-2. Main circuit board DIP switch funtions"
on page 68.)
Initialized
Check sewing data
3. Turn on the power. After approximately 2 seconds
have passed, "Initialized" will appear on the display.
4. Turn off the power switch, set DIP switch No. 4 on
the main circuit board to ”OFF”, and then close the
control box cover.
NOTE:
・
When the backup initialization is carried out, the
sewing data values will be reset to the values
shown at left.
■
Sewing patterns 129 needle
■
Xscale
・
Yscale 100% for all sewing
patterns
■
Production counter 0
■
1st bobbin counter 300
■
2nd bobbin counter 300
■
Speed 2100 spm
■
Loop length 100
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
○
main circuit board