Bronkhorst®
Instruction Manual Vapor Delivery Module
9.17.079D
16
4.6.1.2 Starting process
Procedure
Actions
B1
Set the heater at right temperature
·
Give set point to the heater; wait until the
temperature is stabilized
B2
Start gas flow
·
Give setpoint to MFC
Make sure that the carrier gas is always flowing when
the liquid flow is on. Preferably, let always gas flow in
the carrier gas line when the system is filled with liquid.
B3
Start liquid flow
·
Give setpoint LFC, wait until stabilization
Close supply pressure of the liquid vessel during the
process. The pressure controller of the inert gas supply
can influence the stability of the liquid flow controller.
B4
Connect process
·
Open V7, close V6
4.6.1.3 Stopping process
Procedure
Actions
C1
Disconnect process
·
Open V6, close V7
C2
Stop liquid flow
·
Give setpoint = 0 to LFC
C3
Optional: Stop gas flow
·
Give setpoint = 0 to MFC
Make sure that the carrier gas is always flowing when
the liquid flow is on. Preferably, let always gas flow in
the carrier gas line when the system is filled with liquid.
4.6.1.4 Leaving system overnight
Procedure
Actions
D1
Relieve the supply pressure from the liquid- and
carrier gas lines
·
Close V2 and V3
4.6.1.5 Emptying and purging system
Procedure
(1,2)
Actions
E1
Relieve the supply pressure from the liquid- and
carrier gas lines
·
Close V2 and V3
E2
Purge liquid out of lines
·
Open V1 and V5
E3
Purge lines with inert gas
·
Open V4, V6
·
Close V7
·
Give setpoint to MFC
E4
Optional: purge with inert liquid
Connect inert liquid to inert gas supply, proceed from E2
E5
Optional: alter E3 and E4 for a few times
(1)
If the liquid is reactive or aggressive, be sure to remove air (and water vapor) carefully, before introducing liquid in the
system.
(2)
If the liquid is reactive, aggressive, poisonous, toxic, or flammable, beware that the system is purged fully (preferably with
inert liquid, E3, E4, E5) before opening the system.
·
In case of non-pure liquids, place a filter upstream the liquid flow controller.
·
Mount the VDM upright.
Содержание VDM Series
Страница 4: ...Bronkhorst Instruction Manual Vapor Delivery Module 9 17 079D 4 ...
Страница 13: ...Bronkhorst Instruction Manual Vapor Delivery Module 9 17 079D 13 3 7 Connectors hook up diagram ...
Страница 23: ...Bronkhorst Instruction Manual Vapor Delivery Module 9 17 079D 23 5 3 2 Vapor pressure of water ...