
Brocade TurboIron 24X Series Hardware Installation Guide
27
Part Number: 53-1003053-03
Installing the TurboIron 24X
Powering on the system
Powering on the system
Note the following before powering on the system:
•
The socket should be installed near the equipment and should be easily accessible.
•
If the outlet is not rated 115 or 120V, stop and get the appropriate cable for the outlet.
•
If your installation requires a different power cord than that supplied with the device, make sure you obtain a power cord
displaying the mark of the safety agency that defines the regulations for power cords in your country. The mark is your assurance
that the power cord can be used safely with the device.
•
Ensure that all power supplies are fully and properly inserted.
•
Remove the power cord from the shipping package.
•
Attach the AC power cord to the AC connector on the rear panel as shown in
NOTE
Align the locating notch on the underside of the AC power cord before inserting.
•
Insert the power cord plug into a properly grounded 115V or 120V electrical outlet.
FIGURE 3
Attaching the AC power cord
•
Repeat this procedure for the second power supply.
•
Verify the device is working properly (refer to
Powering off the system
To turn an AC system OFF:
•
Unplug the power cords from the power source.
Verifying proper operation
After you have installed any additional power supplies and powered on the system, verify that the device is working properly.
1.
Verify that the LEDs on the power supply and system power LED are solid green.
2.
Verify proper operation by observing the LEDs on the front panel.