INSTALLATION
4.4
FIRST CONNECTION
1.
Remove the package.
2.
Locate machine on an even horizotal place.
3.
Connect electricity (380 V).
For 220V working models connect 220V.
4.
Checks the sequence of phases (3 1 n 1 grounding).
5.
Connect air pressure (6-8 bar).
6.
Check oil level in filter-regulator.
►
The first connection should be made by service team. The manufacturer does not bear
responsibility for damages incurred by connection the machine by not service team.
First connection by service team:
•
Eliminate failures occured during transportation.
•
Check the uniformity of machine installation.
•
Check the electrical and air connections.
•
Switch on the machine
•
Instruct the operator of the machine
•
Give instruction on the safety and maintenance of machine
Note: If in new connection machine does not work, then the cause could be the
inconsistency of phases in the electrical network, so that motors does not rotate in the
opposite direction, the machine is protected by a special control-phase relay. Changes of phases in
the connection socket should be performed by service or qualified electrician.