6
3. PREPARE THE HOOD LOCATION
Use the proper diagram below and or next page for placement of ductwork and electrical cutout in
cabinet or wall. For a non-ducted installation, DO NOT cut a duct access hole.
VERTICAL DUCT
ACCESS HOLE
11"
5¼"
5¼"
CENTER
LINE
HOOD MOUNTING SCREWS (5)
ELECTRICAL
ACCESS HOLE
(
IN
CABINET
BOTTOM
)
WOOD SHIMS
(
RECESSED
-
BOTTOM
CABINETS
ONLY
)
CABINET FRONT
1½"
2"
3⅛"
7½"
*
10½" (24"
HOOD
)
13½" (30"
HOOD
)
5½"
10⅛"
2¼"
10½" (24"
HOOD
)
13½" (30"
HOOD
)
CABINET
BOTTOM
3¼”
X
10”
VERTICAL DUCTING
3¼”
X
10”
HORIZONTAL DUCTING
CABINET
BOTTOM
CABINET FRONT
HORIZONTAL DUCT
ACCESS HOLE
HOOD
MOUNTING
SCREWS (5)
ELECTRICAL
ACCESS HOLE
(
IN
WALL
)
4"
CENTER
LINE
WOOD SHIMS
(
RECESSED
-
BOTTOM
CABINETS
ONLY
)
7
1
/
2
"
3/4"
3/8"
*
5¼"
5¼"
2¼"
10½" (24"
HOOD
)
13½" (30"
HOOD
)
10½" (24"
HOOD
)
13½" (30"
HOOD
)
*
Note the extra wood shim and mounting screw near the cabinet front.
Содержание BCS3 Series
Страница 12: ...12 11 SERVICE PARTS HL0242...