3
PREFACE
If you have any questions, or if you need more informa-
tion about specifi c subjects relating to this boiler, please
do not hesitate to contact us.
The data published in these technical instructions is
based on the latest information and is subject to revisi-
ons.
We reserve the right to modify the design and/or confi-
guration of our products at any moment without being
obliged to adjust earlier supplies accordingly.
1. BOILER DESCRIPTION
Classifi cation type for evacuation of the combustion pro-
ducts: B11 BS.
For further advice or information contact Broag Ltd.
The Remeha Gas 5c is supplied with electronic junction
with insulated casings.
Water connections Ø 107 mm int.
2. CONSTRUCTION DETAILS
2.2 Burners
The burners are stainless steel, atmospheric type. They
guarantee a low noise level.
2.3 Boiler fl oor
The Remeha Gas 5c boiler is supplied with a refl ecting
fl oor plate with ventilation underneath.
2.4 Assembly
The boiler will be assembled on site.
These technical instructions contain useful and important
information for the correct operation and maintenance of
the Remeha central heating boiler, model Gas 5c/5c Duo.
Furthermore, important instructions are given to prevent
accidents and serious damage before commissioning
and during operation of the boiler, to ensure safe and
trouble free boiler operation.
Read these instructions carefully before putting the boiler
into operation, familiarize yourself with its operation and
control and strictly observe the instructions given.
The Remeha Gas 5c boiler is a cast iron sectional boiler
with atmospheric burners.
Suitable for all qualities of natural gas, cat. I 2 H (20 mbar).
The boiler meets the requirements of the CE regulations
at the following directives:
- Gas appliance directive no. 90/396/EEC
- Electrical low voltage directive no. 73/23/EEC
- Machinery directive no. 89/392/EEC
- E.M.C. directive no. 89/336/EEC
- Effi ciency directive no. 92/42/EEC.
2.1 General
- Boiler block of cast iron sections joined together with
conical nipples.
- Gas train can be fi tted on the left hand or right hand
side of the boiler.
- Water connections can be fi tted on the left hand side
or right hand side of the boiler. The gas train should
if possible always be fi tted on the same side as the
fl ow connection. If required it can be fi tted opposite
(extension cables can be provided on request).
- The casings can be fi tted after the boilers have been
installed.
- Control panel is fi tted in the front casing.
- Cleaning of the cast iron block from top of the boiler.
Содержание SEAGOLD 1A HR
Страница 1: ......
Страница 2: ......
Страница 3: ......
Страница 4: ......
Страница 5: ......
Страница 6: ......
Страница 7: ......
Страница 8: ......
Страница 9: ......
Страница 10: ......
Страница 11: ......
Страница 12: ......
Страница 13: ......
Страница 14: ......
Страница 15: ......
Страница 16: ......
Страница 17: ......
Страница 18: ......
Страница 19: ......
Страница 20: ......
Страница 21: ......
Страница 22: ......
Страница 23: ......
Страница 24: ......
Страница 25: ......
Страница 26: ......
Страница 27: ......
Страница 28: ......
Страница 29: ......
Страница 30: ......
Страница 31: ......
Страница 32: ......
Страница 33: ......
Страница 34: ......
Страница 35: ......
Страница 36: ......
Страница 37: ......
Страница 38: ......
Страница 39: ......
Страница 40: ......
Страница 41: ......
Страница 42: ......
Страница 43: ......
Страница 44: ......
Страница 45: ......
Страница 46: ......
Страница 47: ......
Страница 48: ......
Страница 49: ......
Страница 50: ......
Страница 51: ......
Страница 52: ......
Страница 53: ......
Страница 54: ......
Страница 55: ......
Страница 56: ......
Страница 57: ......
Страница 58: ......
Страница 59: ......
Страница 60: ......
Страница 61: ......
Страница 62: ......
Страница 63: ......
Страница 64: ......
Страница 65: ......
Страница 66: ......
Страница 67: ......
Страница 68: ......
Страница 69: ......
Страница 70: ......
Страница 71: ......
Страница 72: ......
Страница 73: ......
Страница 74: ......
Страница 75: ......
Страница 76: ......
Страница 77: ......
Страница 78: ......
Страница 79: ......
Страница 80: ......
Страница 81: ......
Страница 82: ...Atmospheric gas boiler 92 372 kW remeha Gas 3c Technical information ...
Страница 98: ...1 remeha Gas 3c ECO Fully condensing atmospheric gas boiler 101 407 kW Technical information ...
Страница 114: ...Technical information remeha Gas 3d Atmospheric gas boiler with reminox Low NOx burners 90 360 kW ...
Страница 124: ...11 9 5 2 Complete instrument panel Fig 09 Wiring diagram for the complete instrument panel ...
Страница 130: ...Remeha Gas 350 Atmospheric gas boiler 64 174 kW Technical information R e m e h a G a s 3 5 0 ...
Страница 154: ...9 9 5 Wiring diagram boiler Fig 06 Wiring diagram ...
Страница 158: ...1 Atmospheric gas boiler 278 1058 kW R e m e h a G a s 5 5 0 5 5 0 D u o Technical information Remeha Gas 550 550 Duo ...
Страница 172: ...15 9 7 Wiring diagrams Fig 08 Electrical principle diagram 04 05F SC 00001 ...
Страница 178: ......
Страница 179: ......
Страница 180: ......
Страница 181: ......
Страница 182: ......
Страница 183: ......
Страница 184: ......
Страница 185: ......
Страница 186: ......
Страница 187: ......
Страница 188: ......
Страница 189: ......
Страница 190: ......
Страница 191: ......
Страница 192: ......
Страница 193: ......
Страница 194: ......
Страница 195: ......
Страница 196: ......
Страница 197: ......
Страница 198: ......
Страница 199: ......
Страница 200: ......
Страница 201: ......
Страница 202: ......
Страница 203: ......
Страница 204: ......
Страница 205: ......
Страница 206: ......
Страница 207: ......
Страница 208: ......
Страница 209: ......
Страница 210: ......
Страница 211: ......
Страница 212: ......
Страница 213: ......
Страница 214: ......
Страница 215: ......
Страница 216: ...1 Atmospheric gasboiler 276 1044 kW remeha Gas 5a 5a Duo Technical information ...
Страница 227: ...12 remeha Gas 5a 5a Duo 8 4 Wiring diagram Fig 05 Wiring diagram ...
Страница 232: ...1 Remeha Gas 5c 5c Duo Atmospheric gas boiler 278 1058 kW Technical information R e m e h a G a s 5 c 5 c D u o ...
Страница 244: ...13 9 6 2 Complete instrument panel Fig 08 Scheme complete instrument panel For legend see page 12 ...
Страница 245: ...Remeha Gas 5c 5c Duo 14 9 7 Wiring diagram boiler Fig 09 Wiring diagram boiler For legend see page 12 ...
Страница 248: ......
Страница 249: ......
Страница 250: ......
Страница 251: ......
Страница 252: ......
Страница 253: ......
Страница 254: ......
Страница 255: ......
Страница 256: ......
Страница 257: ......
Страница 258: ......
Страница 259: ......