Remeha Gas
550/550 Duo
16
10 COMMISSIONING
Note:
Commissioning must only be carried out by a
qualified engineer with the relevant training and certifica-
tion i.e. Acops - Corgi. A commissioning data sheet /
boiler logbook must be completed on site for issue to
owner.
1. Check the gas connections.
2. Check the electrical supply (L/N and earth).
3. Check the water connections and whether the instal-
lation is full and under system pressure.
4. Switch on the circulation pump and check the rota-
tion direction.
5. Open the main gas cock (purge gas pipeline).
6. Switch on the electrical supply.
7. Set both the thermostats to about 85°C.
8. If a control system is built in, put the selector switch-
on manual operation.
9. Switch on the boiler.
- If a
valve leakage control
is installed the following
will take place:
A membrane pump will create overpressure
between safety valves VA1 & VA2, which are
inside the multibloc gas valve. When, within 27
sec, an overpressure of 30 mbar (compared to the
inlet pressure) is reached, the electric supply is
released to the control box.
10. After a waiting time of about 13 seconds the ignition
starts. The magnetic valve MK opens and ignition
burner lights. At a minimum ionisation current of 3
µA the ignition stops. After 5 seconds the main gas
valves VA1 en VA2 will open. The boiler runs.
11. Let the boiler run for a couple of minutes on high fire
to clear any air still in the gas pipe.
Fig. 09 Electric connection central alarm
00.03F.60.00042
Содержание SEAGOLD 1A HR
Страница 1: ......
Страница 2: ......
Страница 3: ......
Страница 4: ......
Страница 5: ......
Страница 6: ......
Страница 7: ......
Страница 8: ......
Страница 9: ......
Страница 10: ......
Страница 11: ......
Страница 12: ......
Страница 13: ......
Страница 14: ......
Страница 15: ......
Страница 16: ......
Страница 17: ......
Страница 18: ......
Страница 19: ......
Страница 20: ......
Страница 21: ......
Страница 22: ......
Страница 23: ......
Страница 24: ......
Страница 25: ......
Страница 26: ......
Страница 27: ......
Страница 28: ......
Страница 29: ......
Страница 30: ......
Страница 31: ......
Страница 32: ......
Страница 33: ......
Страница 34: ......
Страница 35: ......
Страница 36: ......
Страница 37: ......
Страница 38: ......
Страница 39: ......
Страница 40: ......
Страница 41: ......
Страница 42: ......
Страница 43: ......
Страница 44: ......
Страница 45: ......
Страница 46: ......
Страница 47: ......
Страница 48: ......
Страница 49: ......
Страница 50: ......
Страница 51: ......
Страница 52: ......
Страница 53: ......
Страница 54: ......
Страница 55: ......
Страница 56: ......
Страница 57: ......
Страница 58: ......
Страница 59: ......
Страница 60: ......
Страница 61: ......
Страница 62: ......
Страница 63: ......
Страница 64: ......
Страница 65: ......
Страница 66: ......
Страница 67: ......
Страница 68: ......
Страница 69: ......
Страница 70: ......
Страница 71: ......
Страница 72: ......
Страница 73: ......
Страница 74: ......
Страница 75: ......
Страница 76: ......
Страница 77: ......
Страница 78: ......
Страница 79: ......
Страница 80: ......
Страница 81: ......
Страница 82: ...Atmospheric gas boiler 92 372 kW remeha Gas 3c Technical information ...
Страница 98: ...1 remeha Gas 3c ECO Fully condensing atmospheric gas boiler 101 407 kW Technical information ...
Страница 114: ...Technical information remeha Gas 3d Atmospheric gas boiler with reminox Low NOx burners 90 360 kW ...
Страница 124: ...11 9 5 2 Complete instrument panel Fig 09 Wiring diagram for the complete instrument panel ...
Страница 130: ...Remeha Gas 350 Atmospheric gas boiler 64 174 kW Technical information R e m e h a G a s 3 5 0 ...
Страница 154: ...9 9 5 Wiring diagram boiler Fig 06 Wiring diagram ...
Страница 158: ...1 Atmospheric gas boiler 278 1058 kW R e m e h a G a s 5 5 0 5 5 0 D u o Technical information Remeha Gas 550 550 Duo ...
Страница 172: ...15 9 7 Wiring diagrams Fig 08 Electrical principle diagram 04 05F SC 00001 ...
Страница 178: ......
Страница 179: ......
Страница 180: ......
Страница 181: ......
Страница 182: ......
Страница 183: ......
Страница 184: ......
Страница 185: ......
Страница 186: ......
Страница 187: ......
Страница 188: ......
Страница 189: ......
Страница 190: ......
Страница 191: ......
Страница 192: ......
Страница 193: ......
Страница 194: ......
Страница 195: ......
Страница 196: ......
Страница 197: ......
Страница 198: ......
Страница 199: ......
Страница 200: ......
Страница 201: ......
Страница 202: ......
Страница 203: ......
Страница 204: ......
Страница 205: ......
Страница 206: ......
Страница 207: ......
Страница 208: ......
Страница 209: ......
Страница 210: ......
Страница 211: ......
Страница 212: ......
Страница 213: ......
Страница 214: ......
Страница 215: ......
Страница 216: ...1 Atmospheric gasboiler 276 1044 kW remeha Gas 5a 5a Duo Technical information ...
Страница 227: ...12 remeha Gas 5a 5a Duo 8 4 Wiring diagram Fig 05 Wiring diagram ...
Страница 232: ...1 Remeha Gas 5c 5c Duo Atmospheric gas boiler 278 1058 kW Technical information R e m e h a G a s 5 c 5 c D u o ...
Страница 244: ...13 9 6 2 Complete instrument panel Fig 08 Scheme complete instrument panel For legend see page 12 ...
Страница 245: ...Remeha Gas 5c 5c Duo 14 9 7 Wiring diagram boiler Fig 09 Wiring diagram boiler For legend see page 12 ...
Страница 248: ......
Страница 249: ......
Страница 250: ......
Страница 251: ......
Страница 252: ......
Страница 253: ......
Страница 254: ......
Страница 255: ......
Страница 256: ......
Страница 257: ......
Страница 258: ......
Страница 259: ......