Remeha Gas
550/550 Duo
18
1
2
3
1. pressure regulator
2. part load adjustment
ring
3. hydraulic brake
(setting cap)
Fig. 10 Dungs MB-ZRDLE 415 / 420 S22.
10.1 Switching off the boiler
1. Switch off the electric supply.
2. Shut off the gas cock.
Warning:
When switched off and full of water the boiler
could be damaged if the temperature falls below freezing
point.
Note:
Commissioning must only be carried out by a
qualified engineer with the relevant product training and
certification i.e. Acops - Corgi. A commissioning data
sheet / logbook must be completed on site for issue to
owner.
11 MAINTENANCE
To maintain maximum efficiency it is essential to service
the boiler, check safety parameters and re-set combus-
tion once a year.
Normal Service Maintenance
- Isolate power , controls and gas supply.
- Remove front, top casings and flue hood covers.
- Remove gas manifold.
- Remove the burners and floor plates.
- Clean the internal flue ways of the boiler.
- Clean the floor underneath the boiler and boiler room.
- Clean the burners internally and externally using a
soft brush.
- Clean the gas train, ignition, pilot burner, thermostats
and wiring.
- Check and re-set/re-place ignition electrode and ioni-
sation probe as found necessary.
- Re-assemble boiler.
- Check ignition and ionisation cables for connections
and continuity.
- Restore power, controls and gas supply.
- Check start program, ignition time and safety times.
- Check flame protection and thermostats.
- Check boiler input at 100% (full load) and 50% (part
load) load.
- Carryout a combustion efficiency test.
- Check the boiler and immediate installation connecti-
ons for water leaks (seals).
- Check gas train and gas pipe for gas leaks.
- Check flue connections.
- Clean boiler casings.
- Complete a commissioning report.
Содержание SEAGOLD 1A HR
Страница 1: ......
Страница 2: ......
Страница 3: ......
Страница 4: ......
Страница 5: ......
Страница 6: ......
Страница 7: ......
Страница 8: ......
Страница 9: ......
Страница 10: ......
Страница 11: ......
Страница 12: ......
Страница 13: ......
Страница 14: ......
Страница 15: ......
Страница 16: ......
Страница 17: ......
Страница 18: ......
Страница 19: ......
Страница 20: ......
Страница 21: ......
Страница 22: ......
Страница 23: ......
Страница 24: ......
Страница 25: ......
Страница 26: ......
Страница 27: ......
Страница 28: ......
Страница 29: ......
Страница 30: ......
Страница 31: ......
Страница 32: ......
Страница 33: ......
Страница 34: ......
Страница 35: ......
Страница 36: ......
Страница 37: ......
Страница 38: ......
Страница 39: ......
Страница 40: ......
Страница 41: ......
Страница 42: ......
Страница 43: ......
Страница 44: ......
Страница 45: ......
Страница 46: ......
Страница 47: ......
Страница 48: ......
Страница 49: ......
Страница 50: ......
Страница 51: ......
Страница 52: ......
Страница 53: ......
Страница 54: ......
Страница 55: ......
Страница 56: ......
Страница 57: ......
Страница 58: ......
Страница 59: ......
Страница 60: ......
Страница 61: ......
Страница 62: ......
Страница 63: ......
Страница 64: ......
Страница 65: ......
Страница 66: ......
Страница 67: ......
Страница 68: ......
Страница 69: ......
Страница 70: ......
Страница 71: ......
Страница 72: ......
Страница 73: ......
Страница 74: ......
Страница 75: ......
Страница 76: ......
Страница 77: ......
Страница 78: ......
Страница 79: ......
Страница 80: ......
Страница 81: ......
Страница 82: ...Atmospheric gas boiler 92 372 kW remeha Gas 3c Technical information ...
Страница 98: ...1 remeha Gas 3c ECO Fully condensing atmospheric gas boiler 101 407 kW Technical information ...
Страница 114: ...Technical information remeha Gas 3d Atmospheric gas boiler with reminox Low NOx burners 90 360 kW ...
Страница 124: ...11 9 5 2 Complete instrument panel Fig 09 Wiring diagram for the complete instrument panel ...
Страница 130: ...Remeha Gas 350 Atmospheric gas boiler 64 174 kW Technical information R e m e h a G a s 3 5 0 ...
Страница 154: ...9 9 5 Wiring diagram boiler Fig 06 Wiring diagram ...
Страница 158: ...1 Atmospheric gas boiler 278 1058 kW R e m e h a G a s 5 5 0 5 5 0 D u o Technical information Remeha Gas 550 550 Duo ...
Страница 172: ...15 9 7 Wiring diagrams Fig 08 Electrical principle diagram 04 05F SC 00001 ...
Страница 178: ......
Страница 179: ......
Страница 180: ......
Страница 181: ......
Страница 182: ......
Страница 183: ......
Страница 184: ......
Страница 185: ......
Страница 186: ......
Страница 187: ......
Страница 188: ......
Страница 189: ......
Страница 190: ......
Страница 191: ......
Страница 192: ......
Страница 193: ......
Страница 194: ......
Страница 195: ......
Страница 196: ......
Страница 197: ......
Страница 198: ......
Страница 199: ......
Страница 200: ......
Страница 201: ......
Страница 202: ......
Страница 203: ......
Страница 204: ......
Страница 205: ......
Страница 206: ......
Страница 207: ......
Страница 208: ......
Страница 209: ......
Страница 210: ......
Страница 211: ......
Страница 212: ......
Страница 213: ......
Страница 214: ......
Страница 215: ......
Страница 216: ...1 Atmospheric gasboiler 276 1044 kW remeha Gas 5a 5a Duo Technical information ...
Страница 227: ...12 remeha Gas 5a 5a Duo 8 4 Wiring diagram Fig 05 Wiring diagram ...
Страница 232: ...1 Remeha Gas 5c 5c Duo Atmospheric gas boiler 278 1058 kW Technical information R e m e h a G a s 5 c 5 c D u o ...
Страница 244: ...13 9 6 2 Complete instrument panel Fig 08 Scheme complete instrument panel For legend see page 12 ...
Страница 245: ...Remeha Gas 5c 5c Duo 14 9 7 Wiring diagram boiler Fig 09 Wiring diagram boiler For legend see page 12 ...
Страница 248: ......
Страница 249: ......
Страница 250: ......
Страница 251: ......
Страница 252: ......
Страница 253: ......
Страница 254: ......
Страница 255: ......
Страница 256: ......
Страница 257: ......
Страница 258: ......
Страница 259: ......