101652 Rev. A
3
75 Series Installation
1
Cartridge Installation
A.
Turn off water supplies.
Remove cover (1),
bonnet nuts (2) and test caps (3) from the rough-
in body (4) R75000. Place a bucket or small
container over the front of the valve body and
slowly open the water supplies to flush any
debris from the supply lines before installing the
cartridge. Turn the water supplies back off.
1
2
3
2
4
3
B.
Rotate the valve cartridge (1) so the word “UP”
(2) appears on the top. The “H” is on the hot side
and the “C” is on the cold side. Add silicone lube
to the three o-rings (3) shown above to make
the cartridge easier to install and remove from
the valve body. Insert cartridge into valve body
as shown. Ensure the keys on the body are fully
engaged with the slots in the body (4). A light
coating of plumbers grease applied to o-rings may
aid in assembly.
2
3
1
4
4
Thread bonnet nut (2) onto cartridge. Hand tighten
securely. Slide o-ring (1) over the cartridge and
bonnet.
C.
2
1
For the exceptions of back to back or reverse
installations (hot on right and cold on left) only:
Rotate valve cartridge (1) so “H” is on the hot side
and “C” is on the cold side and the word “UP” (2)
appears on the bottom. Apply silicone lube to the
three o-rings shown above to make the cartridge
easier to install and remove from the rough-in body.
Install the cartridge making sure that the keys are
fully engaged with the slot in the rough-in body (see
step B). Slide o-ring (3) and bonnet nut (4) over the
cartridge and thread onto the rough-in body. Hand
tighten securely.
Back to back Installation
Cold
Hot
Normal Installation
(changes not required)
Reverse
Installation
2
4
1
3
R75000