![British Gas 330 Скачать руководство пользователя страница 22](http://html.mh-extra.com/html/british-gas/330/330_instructions-for-use-installation-and-servicing_2814451022.webp)
22
0020008877-04
Case Off
9.1 +0.3 -0.3
Case On
9.3 +0.3 -0.3
RANGE RATING TABLE 4
BURNER
%CO
2
m
3
/h
ft
3
/h
3.31
117
2.54
90
1.90
67
1.59 56
1.27
45
APPROXIMATE GAS RATE
OUTPUT
31 kW
24 kW
18 kW
15 kW
12 kW
FAN
SETTING
47
36
29
23
19
Please ensure the British Gas logbook is completed and left
with the user.
10.1 Preliminaries - All Systems
Remove the casing panels, see diagram 10.1.
A competent person in accordance with the current issue of
BS6798 should carry out commissioning.
Make sure that the system has been thoroughly flushed out with
cold water.
Refill the system with water, making sure that all the air is
properly vented from the system and pump, diagram 10.2
shows vent point.
Before operating the boiler check that all external controls are
calling for heat. Do not operate the boiler without water.
Allow the system to reach maximum temperature then switch
off the boiler by isolating from the electrical supply.
Drain the entire system rapidly whilst hot, using the drain tap at
the lowest part of the system. Following completion of the hot
flush, add inhibitor to the system.
Diagram 10.1
INNER
CASING
PANEL
CASING
PANEL
12361
SECURING
SCREWS
SECURING
SCREW (2 OFF)
9.2 Electrical connections - testing
Carry out preliminary electrical system checks as below:
1. Test insulation resistance to earth of mains cable.
2. Test the earth continuity and short circuit of cables.
3. Test the polarity of the mains.
9 Electrical Connections
10 Commissioning
9.3 Pump Connection
Ensure that a separate pump supply cable is fed to the boiler,
see diagram 9.2.
Remove connection box, see diagram 9.1.
Route the pump supply cable through the strain relief cable
gland, connect to the connection box as shown in diagram 9.2.
Refer to diagram 12.1 for wiring colour code.
Refit the connection box to the underside of the boiler using the
two retaining screws.
10.2 Sealed Systems
Fill the system until the pressure gauge registers the
recommended pressure. Clear any air locks and check for
leaks.
Release the cold water to the initial design pressure.
Содержание 330
Страница 32: ...32 0020008877 04 12 Fault Finding Diagram 12 2 12933 ...
Страница 33: ...33 0020008877 04 12 Fault Finding 12191 Diagram 12 3 ...
Страница 34: ...34 0020008877 04 12 Fault Finding Diagram 12 4 12188 ...
Страница 42: ...42 0020008877 04 ...