Bristan SOQ2 SHUAR C Скачать руководство пользователя страница 12

Installation Requirements

12

Need help? Give us a call on 0330 026 6273 and speak to one of our trained advisors.

Conditions of use for Type 2 (Thermostatic mixer) valves

High Pressure

Low Pressure

Maximum Static Pressure (Bar)

10

10

Flow Pressure, Hot & Cold (Bar)

0.5 to 5

0.1 to 1.0

Hot Supply Temperature (ºC)

55 to 65

55 to 65

Cold Supply Temperature (ºC)

Equal to or less than 25

Equal to or less than 25

Code

Operating Pressure

Application

HP-SE

High Pressure

Shower

LP-S

Low Pressure

Shower

This valve has been approved for use in the following 

designations;

If a water supply is fed by gravity then the supply 

pressure should be verified to ensure the conditions of 

use are appropriate for the valve. 

Note: Valves operating outside these conditions cannot 

be guaranteed by the Scheme to operate as Type 2 

valves. 

The valves designation of use, LP if testes against BS EN 

1287, HP if tested against BS EN 1111 and HP & LP if 

tested against both standards.

If a water supply is fed by gravity then the supply 

pressure should be verified to ensure the conditions of 

use are appropriate for the valve
.
Minimum supply pressure for LP Tub application is 0.2 

bar.

Recommended Outlet temperatures

We recommend the following set maximum mixed water 

outlet temperatures for use in all premises:
41ºC for showers;

The maximum mixed water temperature can be 2ºC 

above the recommended maximum set outlet 

temperatures.

Note: 46ºC is the maximum mixed water temperature 

from the bath tap. The maximum temperature takes 

account of the allowable temperature tolerances 

inherent in thermostatic mixing valves and 

temperature losses in metal baths.

Warning: It is not a safe bathing temperature 

for adults or children.

The British Burns Association recommends 37 to 

37.5ºC as a comfortable bathing temperature for 

children. In premises covered by the Care Standards 

Act 2000, the maximum mixed water outlet 

temperature is 43ºC.

The thermostatic mixing valve (TMV) will be installed in 

such a position that maintenance of the TMV and its 

valves and the commissioning and testing of the TMV 

can be undertaken.

Note: The frequency of In-Service tests – 1 year max.

The fitting of isolation valves is required as close as is 

practical to the water supply inlets of the thermostatic 

mixing valve.

The fitting of strainers is recommended as close as is 

practicable to the water supply inlets of the 

thermostatic mixing valve.

Содержание SOQ2 SHUAR C

Страница 1: ...uide Sonique Acute Thermostatic Recessed Mini Shower Valves Models covered SOQ2 SHCAR C AE SHCAR C Please keep this booklet for future Reference Installer when you have read these instructions please...

Страница 2: ...any further help please do not hesitate to give us a call on 0330 026 6273 Important Safety Information General Information Product Features Specifications Dimensions Pack Contents Installation Requir...

Страница 3: ...se consider the following Prior to drilling into walls check that there are no hidden electrical wires cables or water supply pipes This can be checked with the aid of an electronic detector If power...

Страница 4: ...stored water temperature of 60 C is considered sufficient to meet all normal requirements and will minimise the build up of lime scale in hard water areas Important Nominally equal balanced inlet supp...

Страница 5: ...he temperature Turn the control clockwise to decrease the temperature and to turn the shower off 2 Concealing Plate Conceals exposed pipework which is shown when the valve is installed in a wall cavit...

Страница 6: ...e re set to suit site conditions Supply Requirements Minimum cold water supply temperature 5 C Maximum cold water supply temperature 25 C Maximum hot water supply temperature 80 C a maximum hot water...

Страница 7: ...or down the riser rail max 600mm apart as required This allows any existing holes to be reused or covered by the wall brackets The brackets can also be adjusted to sit in the middle of the tiles or i...

Страница 8: ...6 Yellow flow regulator 7 Hexagonal key 8 Valve fixings x2 9 Riser rail fixings x4 10 Showerhead single function 11 Sealing washers x2 12 Shower hose 13 Wall outlet 14 Riser rail 8 Need help Give us a...

Страница 9: ...ust be a minimum head vertical distance from the underside of the cold water storage tank to the showerhead position of at least 1 metre Note Pumped system with Essex flange If you install this shower...

Страница 10: ...ystem with Essex flange Key Isolating Reducing Shower Pump Essex Valve Valve Valve Flange Cold mains supply Cold mains supply Cold mains supply Cold mains supply 1m min 1m min If less than 1m see note...

Страница 11: ...ss effective backflow prevention device immediately upstream of the inlet b so that it draws water by gravity only from a cistern or cylinder having a permanently open vent pipe and the distributing p...

Страница 12: ...inimum supply pressure for LP Tub application is 0 2 bar Recommended Outlet temperatures We recommend the following set maximum mixed water outlet temperatures for use in all premises 41 C for showers...

Страница 13: ...system Mains 1 0 10 bar Gravity 0 1 to 0 5 bar Green 7 litre No Gravity Above 0 5 bar Green 7 litre Yellow 5 litre Unvented Mains Mains Pressurised Instantaneous Water Gas Heater Green 7 litre Yellow...

Страница 14: ...give a temperature of between 45 50 C from the heater Flow regulators are factory fitted Study the table on the previous page and decide which flow regulators etc are required for your particular situ...

Страница 15: ...inished wall surface to fit fully into the shower valve elbows 2 Fit shower valve Position the shower valve into the wall cavity at the required position and mark the fixing holes Warning Please check...

Страница 16: ...of washing up liquid around the inner seal this will help when fitting over the valve shroud Slide the concealing plate over the valve shroud and press firmly against the tiling around the edges Refit...

Страница 17: ...nut Plumb in the wall outlet assembly to the shower valve outlet B Without rear access once wall finished Fit a wall plate elbow not supplied within the wall cavity and plumb in from the shower valve...

Страница 18: ...ly attach the fixing brackets to the wall sing the screws Tips A piece of insulation or masking tape positioned where holes are to be drilled and before marking out the exact position for the fixing h...

Страница 19: ...as shown opposite Then push the riser rail up through the top wall bracket 5 Tighten rail clamps Centre the riser rail within the wall brackets and tighten both clamps onto the rail 6 Fit the riser t...

Страница 20: ...t end onto the shower valve wall outlet ensuring that the rubber washer is fitted 8 Connect shower hose to showerhead Screw the shower hose conical end onto the showerhead ensuring that the rubber was...

Страница 21: ...ture Turn the lever clockwise to decrease the temperature and turn the shower off Riser rail Turning the slider handle will allow the slider to be raised and lowered and the angle of the showerhead to...

Страница 22: ...y isolation test by isolating the cold water supply to the TMV wait for five seconds if water is still flowing check that the temperature is below 46 C If there is no significant change to the set out...

Страница 23: ...ergents or disinfectants or those containing alcohol hydrochloric acid or phosphoric acid Cartridge Maintenance We advise that the shower valve is regularly serviced in hard water areas to maintain th...

Страница 24: ...ver remove the plastic cap loosen the grub screw using the hexagonal key and carefully pull the lever off 3 Using the hexagonal key turn the temperature adjusting screw to alter the temperature Turn c...

Страница 25: ...hat any in line or integral strainers are clean b Any in line or integral check valves or other anti back siphonage devices are in good working order c Any isolating valves are fully open With an acce...

Страница 26: ...issioning and 6 to 8 week testing or between commissioning and 12 to 15 week testing the next in service test can be deferred to 24 to 28 weeks after commissioning b If small changes e g 1 to 2K in mi...

Страница 27: ...eing drawn off elsewhere causing pressure changes or instantaneous boiler temperature changes Do not use other water outlets when using the shower Make sure the maintained inlet pressures are nominall...

Страница 28: ...temperature too cold maximum water temperature incorrectly set Hot water temperature is less than 10 C above the required blend temperature Adjust hot water temperature or wait for water to reheat if...

Страница 29: ...Notes 29 Need help Give us a call on 0330 026 6273 and speak to one of our trained advisors...

Страница 30: ...Notes 30 Need help Give us a call on 0330 026 6273 and speak to one of our trained advisors...

Страница 31: ...r solid guarantees on all our products effective from the date of purchase to give you peace of mind To start your free guarantee visit www bristan com register For any other queries please call our C...

Страница 32: ...Bristan Group Ltd Birch Coppice Business Park Dordon Tamworth Staffordshire B78 1SG Web www bristan com Email enquire bristan com A Masco Company Part Number FI SOQ2 AE SHCAR C Issue D5...

Отзывы: