Dimensions for BFS1/BFS2 (2 pole motors):
In each case the distance is measured by the inner surface of the coupling hub
to the shaft end
Dimensions for TFS
1/FFS1… TFS6/FFS6 (2 pole motors):
TFS1, TFS2 TFS3
TFS4
TFS5 / TFS6
Fra-
me
size
Power
50 Hz / 60
Hz
kW
A
mm
B
mm
C
mm
A
mm
B
mm
C
mm
A
mm
B
mm
C
mm
A
mm
B
mm
C
mm
80
0.75-1.1 /
0.86-1.27
-1
-1
148
90
1.5-2.2 /
1.75-2.55
-2
-10
148
-1.5
-1.5 165 -1.5 -1.5 170
100 3.0 / 3.45
5
0
175 +4.6
0
183
0
0
183
112
4.0 / 4.6
5
0
175 +4.6
0
183
0
0
183
132
5.5-7.5 /
5.75-8.6
1
3
196
-2
-2
196
0
+5
210
+1
0
220
160
11.0- 22
12.6-25.3
7
23
256
+7
+15 256
+7
+10 256
0
0
+3
0
256
279
180 22.0/25.3
Sonder
+7
+13 256
+7
+8
256
+1
0
0
0
256
279
200 30.0/33.5
0
+20 256
200 30.0-37.0/
33.5-41.5
0
+15 256
+1
0
0
0
256
279
225 45.0/51.0
0
+21 262
0
0
+7
+6
262
285
250 55.0/62.0
+2
-3
+6
-3
295
305
280 75.0-90.0/
84.0-101
-34
+6
+30
+1
295
320
315
110.0
-3
0
310
Dim. A: Distance between inner surface of the coupling hub and the
motor shaft end
Dim. B: Distance between inner surface of the coupling hub and
pump shaft end
+ = Inner surface of the coupling hub is higher as shaft end
- = Inner surface of the coupling hub is lower as shaft end
ATTENTION
High axial impact loads on both pump and motor shafts during the cou-
pling assembly process are to be avoided at all costs in order to prevent
any damage to the pump and motor bearings.
11.2 Repairs to the pump
In general, the pumps do not need servicing or maintenance and only need to
be sent to the manufacturer in order to be repaired. Upon request, the manu-
facturer provides training and information sheets on the subject of spindle sets.
12 Disposal
When disposing of the pump or the packaging materials the local and national
regulation for proper disposal must be complied with. Prior to its disposal, the
pump must be completely drained and decontaminated if necessary.
Inner surface of
the coupling hub
Inner surface
of the
coupling hub