Installation
This controller includes a front display, a central control key and a side button.
The controller must be set up vertically, on a plane surface, keeping at least 15cm from the wall
and from other components to ensure proper ventilation.
Make sure that all the hydraulic circuits are shut and that the power supply is isolated before
beginning installation.
4.1
Hydraulic Installation
Fig 1-
Hydraulic System Scheme
4.1.1
Electrolysis Cell
The electrolysis cell can be installed horizontally or vertically. In the vertical installation
the electrical wires must be faced upwards, to allow for the buildup of gases originated from the
electrolysis process on the top of the cell if there is a water circulation failure (Fig.3).
Fig 2 - Electrolysis Cell
Fig 3-
Electrolysis Cell
Position
The cell entry must be connected after the sand filter as shown in Fig 1. When possible, it
is recommended to screw the cell tubing to a wall or a strong panel to prevent it from disruption
due to the mechanical effort caused by the cell’s body.
4.1.2
Temperature probe installation (Colibri model)
The installation of the temperature probe should be performed with a clamp saddle with
½" output, always between the sand filter and the electrolysis cell.