BRIGHT BLUE COLIBRI RX Скачать руководство пользователя страница 9

 

©Copyright  

 FR-V2016 

Les informations contenues dans ce document peuvent être modifiées sans préavis. 

 

 

In  case  the  cover  is  manual,  the  user  must  set  the  equipment  side  switch  to  the  position  "II" 
whenever the pool is covered. 

5.6

 

Disinfection Recommendations 

 

It  is  advisable  to  disinfect  it  overnight.  In  fact,  ultraviolet  radiation  acts  on  the  chlorine 

produced by the electrolysis cell, catalyzing salt regeneration (which is why salt consumption is 
insignificant). If disinfection is carried out overnight, the chlorine concentration rises rapidly and 
the disinfecting effect is much more effective. 
 
For good disinfection practice it is also advisable to maintain a concentration of chlorine stabilizer 
(isocyanuric acid) of 35 ppm; i.e., 35 g / m 3 of water. This concentration, although reduced, allows 
to diminish the diurnal losses of chlorine by the effect of ultraviolet radiation. 
 

6

 

Configuration and Calibration 

All equipment are supplied properly configured and calibrated at the factory so that it is not 

necessary to use these operations at the time of installation. 

 

If you wish to change the factory settings or need to calibrate the ORP current or probe, proceed 
as described in the following chapters. 

 

To enter the Setup / Calibration menu, move the side switch to position II and press the Command 
Button 

 for 5 seconds until the display shows: 

 
 
 
 
 
 

Figure 9 – Calibration / Configuration Menu 

 

Select what you want to configure / calibrate by briefly pressing the Command Button 

 until 

the "<=>" symbol is below the desired option: C.I. - for calibration of the cell current; C.O - for 
ORP calibration; L.O - for setting the ORP limits; INV - for setting the polarity reversal time. 
 
Once the desired option has been selected press the Command 

 for 5 seconds to enter the 

respective operation. 
 
 

6.1

 

Current Calibration 

IMPORTANT NOTICE: This function should only be carried out by trained and qualified 

personnel. Lets you check the current being passed in the cell and re-calibrate the equipment if 
necessary. 
Before calibration, make sure that the salinity level of the water is the desired (never less than 5g 
/ l) and that the temperature is equal to or greater than 20 ° C. 

 

To enter the current setting, select C.I in the Calibration / Configuration menu (see chapter 6). 
When entering calibration the following information will appear on the screen: 
 
 

Содержание COLIBRI RX

Страница 1: ...COLIBRI RX PLUMA RX SALT CHLORINATOR...

Страница 2: ......

Страница 3: ...al Probe 7 5 5 Operation with Pool Coverage 7 5 6 Disinfection Recommendations 8 6 Configuration and Calibration 8 6 1 Current Calibration 8 6 2 ORP Calibration 9 6 3 Setting ORP Limits 10 6 4 Polarit...

Страница 4: ...oller s door open to stabilize temperature and avoid condensation of the electronic components When the controller is turned on remember to let the capacitors discharge before handling them to avoid e...

Страница 5: ...ell can be installed horizontally or vertically In the vertical installation the electrical wires must be faced upwards to allow for the buildup of gases originated from the electrolysis process on th...

Страница 6: ...d under the left side External Controller Instalattion optional 4 2 3 External Controller Installation Optional If you choose to connect an external controller it must emit a potential free signal whi...

Страница 7: ...olysis as a percentage of filtering time in order to increase or decrease production and always choose the best reality of the swimming pool in which the equipment is installed Pressing the control bu...

Страница 8: ...l time chlorine readout ORP _____ mV is displayed on the machine s display In this mode chlorine production should be set to P100 and ORP limits for the range that best fits the pool reality where the...

Страница 9: ...nstallation If you wish to change the factory settings or need to calibrate the ORP current or probe proceed as described in the following chapters To enter the Setup Calibration menu move the side sw...

Страница 10: ...have all the necessary material including a glass of water and absorbent paper in order to clean the probe before introducing the buffers To enter the ORP calibration select the C O option in the Cali...

Страница 11: ...its To set the limits briefly press the Command Button and appears Figure 15 Definition of Upper Limits To change the value briefly press the Command Button to set the desired limit The upper limit ca...

Страница 12: ...or a few seconds then stop tp reverse and stars again on the other polarity 7 Alarms 7 1 Alarm 1 Low Flow This alarm ALARM 1 is released if there is not sufficient water flow in the electrolysis cell...

Страница 13: ...arm 3 Low ORP This alarm ALARM 3 is triggered when the ORP reading is greater than 0mV and less than 150mV and is used to indicate that the chlorine level in the water is too low or that the ORP probe...

Страница 14: ...lysis cell 5 years for the electronic equipment Twelve months for temperature probes except ware out PLUMA 2 years or 10 500h of operation for the electrolysis cell 2 years for the electronic equipmen...

Страница 15: ...s and investment in its country Bright Blue does not take responsibility for any delay or fault caused by circumstances outside its control Possible situation include but are not limited to interrupte...

Отзывы: