![BREDABEDS MURPHY BED W/ RIGHT HUTCH Скачать руководство пользователя страница 12](http://html1.mh-extra.com/html/bredabeds/murphy-bed-w-right-hutch/murphy-bed-w-right-hutch_manual_2806590012.webp)
12
Chapter 1: Hardware insertion.
Chapter 1:
Hardware insertion.
REQUIRED TOOLS
• Rubber Mallet
• Cordless Drill with #2 Phillips
• #2 Phillips screwdriver
REQUIRED HARDWARE
• Hardware Packages #1, #6 & #20
• Hardware Package #2 (mech. box)
• Hardware Packages (depending
on hutch config.) #12 & #16
FIG. 1A
5 58
"
13 3
16
"
20
2534
"
3
4
"
Front Of
Panel
Baseboard Notch
Front Of
Panel
Right Hutch
Left Side
Right Hutch
Right Side
Hutch Options
STEP 1
3 drawers and pull-out night shelf:
Slide open each drawer
slide and attach the drawer slide rails at the location shown
in
red
, with System Screws from hardware package #12. The
gray catch with springs goes towards the back side of the
panel, which is the side of the panel with the baseboard notch.
For video instructions of this step, visit:
breda.us/hutch-ops
Follow this step depending on the hutch configuration ordered.
Slides always align to the front of the panel (finished edge). If you have a slide that
is shorter than the rest, this is for the bottom location near the baseboard notch
(we shorten the bottom drawer for custom baseboard notches made extra deep).