Quick Start Guide
Please read this entire manual before attempting to install and operate this control panel. This
guide is only intended to provide the basic steps necessary for installation and operation.
Each step will reference the portion of the manual where more complete information can be
obtained.
Step 1 – Mounting
Determine the location for mounting your panel and transmitters. The locations may be
indicated on the architectural drawing. Also, the owner or designer of the facility may be
consulted. Mounting guidelines can be found on page 13 of this manual.
Step 2 – Input Wiring
Provide a dedicated circuit at the required 24 VAC operating voltage at each panel mounting
location. Follow all national and local wiring codes. A conductor connected to earth ground
should also be provided. The circuit must include a disconnect switch located within easy
reach of the panel.
Ensure that the step-down transformer provides the correct secondary voltage and has the
necessary volt-amp rating to power each component in the system. Each control panel
requires 0.75 VA, each transmitter requires 2.4 VA, and each expansion pack requires 0.4 VA.
IOM03
Rev 1.1 – May 18, 2021
10
WARNING
This control panel may require the use of voltage levels high enough to cause fatal injuries.
Proper procedures must be followed any time work is performed on this unit.
Only qualified personnel should attempt to install, maintain, or service this equipment.
CAUTION
Operating these devices with the incorrect voltage and power requirements can cause
internal electrical components to overheat and fail. Operation with the wrong power
requirement will void the manufacturer’s warranty and the installer will be responsible for any
damage that occurs.
Contact Brasch Environmental Technologies, LLC before connecting power to the control
panel or transmitters if you are unsure of the correct power requirement.