background image

3

Installation 

S19-310SBFW

Bradley Corporation • 

215-163SBFW Rev. K; ECM 08-539 

6/9/09

Ø

 9" (229mm) Flange 

with (3) 

Ø

 

3

8

" (10mm) 

Holes on 

Ø

 8" (203mm) 

Bolt Circle

Top View From Bowl

9"

(229mm)

25

3

8

(645mm)

86"

(2184mm)  

to Bottom 

of Base

68

11

16

"

(1745mm) 

to Bottom 

of Base

 

Ø 

10¾"

(273mm)

36½" 

(927mm) 

to Bottom 

of Base

6

5

8

(168mm)

10½" 

(267mm)

9½" 

(241mm)

66"

(1676mm) 

to Bottom 

of Base

6"

(152mm)

4½"

(114mm)

 

Ø 

3.1"

(78.7mm)

Installation

Supplies Required:

• (3) 

3

8

" floor anchors and bolts

•  Teflon tape and pipe sealant
•  Piping to 1¼" NPT water supply inlet and to 1¼" NPT 

drain outlet on unit

•  Adequate supply pipe supports
•  Min. 4" drain to accommodate 30 gallons per minute 

discharge for shower waste

•  OPTIONAL: sign-mounting hardware

NOTE: Local codes may require the installation 
of a backfl ow prevention valve to complete proper 
installation. Compliance with local codes is the 
responsibility of the installer. Valve must be tested 
annually to verify that it is functioning properly. Backfl ow 
prevention valves are not included with the fi xture and 
may be supplied by the contractor or purchased from 
Bradley Corporation.

Step 1: Secure base to floor

1.  Install three suitable anchors (supplied by installer) 

for 

3

8

" bolts in the floor.

2.  Bolt the base to the floor anchors using 

3

8

" bolts 

(supplied by installer).

Step 2: Assemble components

1.  Assemble the remaining unit components as 

shown on page 4.

•  Apply teflon tape or pipe sealant (supplied by 

installer) as required to all male-threaded pipe 
joints.

•  Use the rubber grip pad provided or a strap 

wrench around pipes when tightening to prevent 
marring the Bradtect® protective, safety yellow 
coating. Place the grip pad on the pipe, then put 
the wrench over the grip pad and turn the pipe 
with the wrench.

•  The bottom edge of the showerhead should be 

86" (2184mm) from the floor. 

Step 3: Connect water supply

IMPORTANT:  Do not rely on Bradley’s 
Combination Unit to support supply piping.

1.  Connect water supply piping to 1¼" NPT inlet 

on unit (piping by installer). Provide adequate 
supports (by installer) for supply pipe using pipe 
hangers or other means.

2.  Connect drain piping to 1¼" NPT drain outlet on 

unit (piping by installer).

3.  Hang the safety sign from the unit with the curtain 

hooks provided (or mount it to the wall using sign-
mounting hardware by installer).

NOTE:  All dimensions assume standard thread 
engagement. Variations in manufacturing allow for 
+/- 

1

8

" (3mm) per threaded joint. To fi nd the tolerance 

of a dimension, add the number of thread joints in 
between a dimension and multiply it by 

1

8

" (3mm).

Содержание S19-310SBFW

Страница 1: ...sh Combin douche oculaire faciale Combinaci n de ducha de aspersi n y lavaojos rostro Table of Contents Pre Installation Information 2 Installation Instructions 3 Assembly of Components 4 Parts List 5...

Страница 2: ...fy proper operation This equipment should be inspected annually to ensure compliance with ANSI Z358 1 Workers who may come in contact with potentially hazardous materials should be trained regarding t...

Страница 3: ...ler for 3 8 bolts in the floor 2 Bolt the base to the floor anchors using 3 8 bolts supplied by installer Step 2 Assemble components 1 Assemble the remaining unit components as shown on page 4 Apply t...

Страница 4: ...ed Unterschrift Signe Date Date Date Signed Signed Signed DIESES GER T 1ST W CHENTLICH ZU PR FEN ESSAI HEBDOMADAIRE Test le fonctionnement des valves chaque semaine et signe en bas S il y quelque chos...

Страница 5: ...187 1 Flow Control Assembly 23 GPM 15 128 156A 1 Pull Rod 25 Long 16 269 915 1 Grip Pad not shown 17 169 025 2 Elbow NPT 18 169 726 1 Union Female NPT 19 113 006LQ 3 Pipe NPT x 3 20 113 006QX 1 Pipe...

Страница 6: ...ates d inspection Ce mat riel doit tre inspect une fois par an pour assurer sa conformit la norme ANSI Z358 1 Les ouvriers susceptibles d entrer en contact avec des mati res potentiellement dangereuse...

Страница 7: ...e 8 Mettez du produit d tanch it non fourni sur tous les filetages m les Utilisez des tampons autour des tuyaux pour ne pas les endommager lors du serrage Placez le tampon sur le tuyau puis la cl par...

Страница 8: ...Date Date Date Signed Signed Signed DIESES GER T 1ST W CHENTLICH ZU PR FEN ESSAI HEBDOMADAIRE Test le fonctionnement des valves chaque semaine et signe en bas S il y quelque chose qui ne va pas fait...

Страница 9: ...69 847 1 Coude 90 de 1 NPT 13 151 001 2 Crochet 14 S24 188 1 T te de douche 14 1 S24 187 1 Contr le du d bit 23 GPM 15 128 156A 1 Tige 25 16 269 915 1 Tampon anti d rapant non montr 17 169 025 2 Coude...

Страница 10: ...be inspeccionar probar y anotar semanalmente para mantener un funcionamiento adecuado Se debe revisar este equipo anualmente para asegurarse de que cumpla con la norma ANSI Z358 1 Los trabajadores que...

Страница 11: ...e tuber a suministrada por el instalador a todas las juntas de tuber a de rosca macho Usar una almohadilla de agarre alrededor de la tuber a al apretar para evitar estropearla Colocar la almohadilla d...

Страница 12: ...Date Signed Signed Signed DIESES GER T 1ST W CHENTLICH ZU PR FEN ESSAI HEBDOMADAIRE Test le fonctionnement des valves chaque semaine et signe en bas S il y quelque chose qui ne va pas fait un rapport...

Страница 13: ...8 156A 1 Varilla de tiro 24 16 269 915 1 Almohadilla de agarre preempaquetada 17 169 025 2 Codo NPT de 18 169 726 1 Uni n NPT hembra de 19 113 006LQ 3 Tubo NPT x 3 20 113 006QX 1 Tubo NPT de 1 x 73 32...

Отзывы: