5
Express® Lavatory System SS-Series
Installation - Obsolete
SS-3/BIR/WH97TAS
Bradley Corporation • 215-1469 Rev. B; EN 08-805
4/24/08
Installation Instructions
Step 1: Rough in
Note: See Figure 1a below (for Standard Height) and Figure 1b on page 6 (for Juvenile Height)
when roughing in the Express®.
IMPORTANT: Flush the supply lines before making connections. Debris in supply
lines will cause the valves to malfunction.
IMPORTANT: Dimensions shown in Figure 1a are for Juvenile Height (grades
Pre-K thru 5 or 6) and in Figure 1b for Juvenile Height (grades 6
thru 8 or 9)
1. Rough in 1/2" NPT hot and cold supply lines through wall at dimensions shown.
2. Rough in 1-1/2" NPT drain waste connection through wall at dimensions shown.
3. Install ten 3/8" wall anchors with a minimum pull-out rating of 1,000 lbs. (supplied by
installer) at the locations shown in Figure 1a below or Figure 1b on page 6.
Figure 1a
SS-3/BIR/WH97TAS Express® Lavatory System Dimensions
Juvenile Height Mounting (Grades Pre-K thru 5 or 6)