Installation
Lenox
®
Lockers (includes Cubby & "Z" Lockers)
Bradley •
LK-INSTR-001 Rev. N; ECN 17-13-005
10/19/2017
3
Pre-Installation Information
Check Contents
Separate all parts from packaging materials and ensure you have all parts required for installation . If any parts are
missing, do not attempt to install your Lenox
®
Lockers until you obtain all parts .
Supplies required
For lockers with no base, you will need floor anchors and appropriate hardware suitable for your application . For
optional fillers, you will need blocking (for support) and suitable fasteners .
Tools required
• Tape measure
• 9/32" drill bit
• Hammer drill (for drilling into concrete)
• 6’ level and shims (for standard lockers)
• Pop rivet gun (for number plates on standard lockers)
• Right-Angle Power Drill (for 12" wide and 12" deep lockers)
• OPTIONAL: chalk and/or string
Installation Tips
Properly installed lockers will need little adjustment . However, the following tips may be helpful:
• A chalk line drawn across the top of the locker banks will help provide a visual inspection . This is only an
aid and does not replace squaring and leveling the lockers .
• A string line along the top and bottom of the lockers may also be used to help in alignment .
• If shims are required after locker installation is complete, remove obstructive screws, apply the shims then
replace the screws .
• Avoid twisting the locker frames when applying shims .
• Drill pilot holes when fasteners are threaded into the plastic components .
• Power drill
• Phillips driver bit
• Clamps
• 3/16" masonry drill bit (minimum 6" long)
• Circular saw with carbide-tipped blade