Installation
Lenox
®
Lockers (includes Cubby & "Z" Lockers)
Bradley •
LK-INSTR-001 Rev. N; ECN 17-13-005
10/19/2017
15
Figure 10a
ANGLE
BRACKET
(HW0019)
#10-1/2"
LG . SCREW
(FAST-T349)
Back-To-Back Locker Slope Top Installation
10
Mounting strips will be 54" maximum length. Color of strips may vary.
1 . Drill 3/16" dia . clearance holes through the top of the installed lockers, making sure that the holes are located
1-1/4" from the front edge of the locker (see Figure 7a on page 9) .
2 . Position the slope top mounting strips on top of the lockers as shown in Figure 10a .
3 . Temporarily clamp the slope top mounting strips together, making sure they are flush and aligned .
4 . Using the 2" mounting brackets and hardware supplied, anchor the mounting strips to the top of the locker as
shown in Figure 10a . Drill 1/16" pilot holes 1/2" deep for the #10 x 1/2" screws that fasten the angle bracket and
mending plate to the base .
5 . Position the slope top on top of the lockers as shown in Figure 10b on page 15, fitting the slope top groove over
the edge of the locker .
6 . Hold the slope top down tight against the top of the locker and secure with the #8 x 1-1/4" screws provided (see
Figure 10b) . Do not overtighten the screws .
7 . Install the remaining slope top sections per the instructions outlined above .
8 . If desired, caulk the gap in the back edge of the slope top where it meets the wall strip .