GAS CONNECTIONS
The gas supply lines must meet all requirements of the National Fuel Gas
Code ANSI Z223.1-(Latest Edition) and/or in Canada CAN/CGA B149
Installation Codes - (Latest Editions).
The minimum permissible gas supply pressure for the purpose of input
adjustment is 1.0” water column
(.25kPa)
above the operating manifold
pressure. See the rating plate and combination gas control for the manifold
pressure and gas type. The maximum permissible gas supply pressure is
14.0” water column
(3.5kPa)
for natural gas and liquefied petroleum
gases/propane gas.
1. Connect this water heater only to the type of gas (Natural or Propane gas)
as shown on the rating plate. Use clean 1/2 inch black iron pipe. (Dirt and
scale from the pipe can enter the combination control and cause it to
malfunction). The inlet gas line must have a minimum length of 3”
(7.6
cm)
drip leg
(sediment trap)
installed as close to the water heater’s
combination gas control as possible. A ground joint union must be
installed in the gas supply line feeding the water heater to permit
servicing of the water heater. Compounds used on the threaded joints of
the gas piping must be resistant to the action of liquefied petroleum
gases/propane gas.
2. This water heater and its gas connection must be leak tested before
placing the water heater in operation. Check for gas leaks with a soap
16
and water solution and a brush or a commercial leak detector fluid.
NEVER USE A MATCH OR OPEN FLAME FOR TESTING!
CAUTION
The water heater and individual shutoff valve must be disconnected from
the gas supply piping system during any pressure testing of the system at
test pressures in excess of 1/2 psi
(3.5 kPa)
. The water heater must be
isolated from the gas supply piping system by closing its manual shutoff
valve during any pressure testing of the gas supply system at test
pressures equal to or less than 1/2 psi
(3.5 kPa)
. The supply line must be
capped when not connected to the water heater.