Page 29
The Brute Elite 125
water temperatures. The boiler setpoint is used to limit
the maximum water temperature leaving the boiler only.
The modulation rate is controlled by a 4-20mA (0-
10Vdc using converter) signal supplied by an external
control. When setting up a system using an external
control care must be taken to set the external control
algorithms to prevent the boiler from short cycling or
"hunting " to prevent premature component failure.
NOTE:
A call for DHW will override external control.
9.4 Hydronic Heating Using Local Lead-
Lag/Cascading Feature
When using single or multiple Brute Elite's in lead-
lag configuration, the system sensor is used to monitor
the demand and modulation rates of the operating
system (see
Section 7
for wiring instructions).
Let’s consider the following example:
Three Brute Elite boilers (let’s call them “Lead”,
“Slave1” and “Slave2”) tied together via Modbus
1 connection, with appropriate RMT Address (1, 2,
3). System sensor input is used to indicate common
secondary loop temperature.
System setpoint = 150°F
HS (hysteresis) = 10°F (default)
BL (base load) = 50% (default)
Anti-short-cycle = 5 minutes
Run sequence is initiated when system temperature
falls to 140°F (setpoint less hysteresis value). Lead
boiler will start. All firing rates will depend on several
application characteristics, including flow rate, system
load, water volume, etc. Boilers will start at a rate of
35%. If the load is such that Lead’s rate increases to
50%, “Slave1” will go through its startup sequence and
begin firing at 35%. At this point, both boilers (Lead and
Slave1) will continue to respond simultaneously to the
load/system characteristics, by modulating up or down
together, in relation to the relative system setpoint and
load characteristics.
Scenario 1: If the system loop temperature rises quickly,
and moves above setpoint, then the boilers will
Figure 24. Outdoor Reset Setpoint Temperatures.
simultaneously drop their firing rate. If when
reaching the point where both boilers drop toward
their minimum firing rate (20%), then the first
slave will drop out. Slave1 will remain unavailable
until its ASC timer has expired (5 minutes). If
the load were to increase such to drive all active
boilers to 50% firing rate or more, during the ASC
time, Slave2 will begin its startup sequence and
begin to fire at 35%, etc.
Scenario 2: If the system loop temperature continues
to drop (load increases), then the two boilers will
increase firing rate together. At 50%, Slave2 will
begin its firing sequence and be added to the group.
All three boilers will continue to fire simultaneously at
equal input rates or…
1. Modulation rate approaches minimum firing rate
(20%), in which case Slave2 will first drop out, and
then Slave1, accordingly.
2. System temperature reaches 10°F (HS- hysteresis
value) above setpoint (e.g. 160°F), in which case
remaining boiler will shut off.
3. Any of the boilers approach its high limit
temperature the individual boiler will modulate
back.
9.5 Warm Weather Shutdown
Warm weather shutdown overrides a central
heat call for heat when the outdoor air temperature is
greater than the warm weather shutdown setpoint. Warm
weather shutdown is always active whenever there
is an outdoor sensor attached to the control. To avoid
warm weather shutdown the warm weather shutdown
temperature should be increased as necessary. The warm
weather shutdown setpoint can be adjusted in SETUP
mode, using the SD menu.
9.6 Domestic Hot Water Demand
For Combi (BLMC), DHW demand is triggered
by a flow switch located near the DHW cold water
inlet. When water begins to flow (open faucet, shower,
etc.), the boiler will fire, based on the water temperature
requirements. It may cycle on and off under very low
flow rates. Minimum flow is 0.5 gpm.
For BLMH, an optional indirect water heater can
be piped-in using Brute Elite's integral 3-way valve as
a zone valve. An aquastat in the indirect water heater
connected in place of the flow switch will signal demand
for DHW. The service person should note the minor
wiring differences on
Figure 22
.
Содержание brute elite 125 BLMH
Страница 42: ...Page 40 Bradford White Corp Figure 28 Panel Assembly Door Top...
Страница 43: ...Page 41 The Brute Elite 125 Figure 29 Panel Assembly Door Middle...
Страница 44: ...Page 42 Bradford White Corp Figure 30 Panel Assembly Door Bottom...
Страница 45: ...Page 43 The Brute Elite 125 Figure 31 Base Jacket Assembly...
Страница 46: ...Page 44 Bradford White Corp Figure 32 Heat Exchanger Cabinet Fan...
Страница 47: ...Page 45 The Brute Elite 125 Figure 33 Heat Exchanger Burner Components...
Страница 48: ...Page 46 Bradford White Corp Figure 34 Pump Assembly Components...
Страница 49: ...Page 47 The Brute Elite 125 Figure 35 Plumbing Components...
Страница 50: ...Page 48 Bradford White Corp...
Страница 51: ...Page 49 The Brute Elite 125...