32
Venting continued-
3. Cut the recommended 3 ½ in
(8.9 cm)
diameter hole for 2 in
(5.1 cm)
vent terminations, 6 5/8 in
(16.9 cm)
diameter
hole for 4 in
(10.2 cm)
vent termination, or 4 ½ in
(11.5 cm)
for 3 in
(7.6 cm)
vent termination.
4. Partially assemble vent kit.
a. Cement Y concentric fitting to larger diameter kit pipe (see Figure 20).
b. Cement rain cap to smaller diameter kit pipe (see Figure 21).
5. Install concentric Y fitting and pipe assembly
through the structure’s hole and field-supplied roof boot/flashing. Do
NOT
allow insulation or other materials to accumulate inside pipe assembly when installing through the hole.
6. Install rain cap and small diameter pipe assembly in concentric Y fitting and large pipe assembly. Ensure small
diameter pipe is cemented and bottomed in concentric Y fitting.
7. Secure assembly to structure as shown in Figure 23. Ensure clearances as shown in Figure 24.
8. Cement heater combustion-air and vent pipes to concentric Y fitting termination assembly. See Figure 24 for proper
pipe attachment.
9. Operate heater through one cycle to ensure combustion-air and vent pipes are properly connected and sealed to
concentric vent termination connections.
Figure 23A - Concentric Vent Side Wall Attachment
Figure 23B
– Concentric Vent Acceptable Dimensions
(A) VENT
DIAMETER
(B) DIMENSION
MIN
MAX
2 in (5.1 cm)
12 in
(30.5 cm)
40 in
(101.6 cm)
3 in (7.6 cm)
12 in
(30.5 cm)
44 in
(111.8 cm)
4 in (10.2 cm)
12 in
(30.5 cm)
37 in
(94 cm)
WARNING!
DO NOT USE 2
” VENT
WITH 100T250/300 MODELS.
Содержание 100T199
Страница 59: ...59 NOTES ...
Страница 60: ...60 NOTES ...