Page 11
STEP 3:
Lift the beam / frame top assembly no less than 20 in. off the ground, move the Crate Bottom away, and then
assemble four Frame Legs. After the Frame Legs
installed and tightened, lower down the Splitter, and allow it standing firmly
on the ground. See FIGURE 6.
REF. NO.
DECSRIPTION
QTY.
4
Frame leg
4
5
Hardware mounted on Frame legs
Including:
5-1
Hex head bolt / M10 x 80
8
5-2
Spring washer / M10
8
5-3
Flat washer / M10
8
5-4
Nut / M10
8
(FIGURE 6)
Page 14
Содержание 3PT22T25
Страница 2: ......
Страница 29: ...Page 22 EXPLODED DIAGRAM PARTS LIST Page 25...
Страница 32: ...Page 25 Page 28...
Страница 34: ...Page 27...
Страница 35: ...Page 28...