Page 7
WARNING!
Use extreme caution unpacking this machine. Some components are very heavy and will require
additional people or mechanical handling equipment.
NOTE:
All references in this manual to the left or right side and front or back of the log splitter are from the operating
position only. Exceptions, if any, will be specified.
Unpacking tools needed:
1. Wrench 14mm
2. Scissors or knife
3. Pry bar or claw hammer
Step 1:
Use a 14mm wrench to remove all the bolts and washers on the metal crate, put aside the packing top and side
frames, then remove the cardboard box. See FIGURE 3.
UNPACKING THE CONTAINER
ASSEMBLY & SET-UP INSTRUCTIONS
Crate Top
Crate Side Frame x 8PCS
Cardboard box
Flat Washer x 48PCS
Hex Head Bolt
x 48PCS
Crate Bottom
Beam / Frame Top Assembly
(FIGURE 3)
Page 10
Содержание 3PT22T25
Страница 2: ......
Страница 29: ...Page 22 EXPLODED DIAGRAM PARTS LIST Page 25...
Страница 32: ...Page 25 Page 28...
Страница 34: ...Page 27...
Страница 35: ...Page 28...