Commissioning report for the appliance
|
75
6 720 644 143 (2010/09)
Modified service functions:
(Select the modified service functions and enter the values here.)
Example: service function 7.d changed from 00 to 01
“Heatronic settings” label filled out and affixed
Heating control unit:
FW 100 |
FW 200 |
FW 500 |
FR 110
TA 250 |
TA 270 |
TA 300
FB 10 × ...... pce, heating circuit code(s):
FB 100 × ...... pce, heating circuit code(s):
FR 10 × ...... pce, heating circuit code(s):
FR 100 × ...... pce, heating circuit code(s):
ISM 1 |
ISM 2
ICM × ...... pce |
IEM |
IGM |
IUM
IPM 1 × ...... pce., heating circuit(s) coding:
IPM 2 × ...... pce., heating circuit(s) coding:
Miscellaneous:
Heating control unit set, notes:
Modified heating control unit settings documented in the controller operating/installation instructions
The following work has been carried out:
Electrical connections checked, notes:
Condensate trap filled
Combustion air/flue gas test carried out
Function check carried out
Was a tightness test carried out on the gas and
water sides?
Commissioning includes checking the settings, a visual boiler tightness test and a function check of the boiler and
control unit. The system installer conducts a test of the heating system.
If, in the course of commissioning, any small installation faults in Bosch components are noticed, Bosch is always
willing to remedy these installation faults after release by the customer. This does not imply any liability for the
installation performance.
The system named above has been checked to the
extent described.
___________________________________________________________
Name of service engineer
The documents have been handed over to the user. The
user has been made aware of the safety information
and operation of the above-mentioned heat source,
including accessories. Attention has been drawn to the
requirement for regular servicing of the above-
mentioned heating system.
__________________________________________________________
Date, user's signature
____________________________________________________________
Date, system installer's signature
Affix the test report here.
Содержание ZSB 30-2 A
Страница 4: ...4 Contents 6 720 644 143 2010 09 ...
Страница 78: ...78 6 720 644 143 2010 09 Notes ...
Страница 79: ... 79 6 720 644 143 2010 09 Notes ...