3.
Check that the plastic frame is secure.
4.
Place the unit on the wall-mounting panel, with the panel positioned between the housing
and the second plastic frame.
5.
Slide the unit into the plastic frame until you feel it lock securely into place.
6.
Finally, check that the unit is securely attached in the installation location.
Installing in a switch cabinet
1.
Install the required number of fixing plates, two for each unit.
2.
Prepare the switch cabinet in such a manner that you are easily able to insert the rack
mount frame directly at the installation point.
3.
Place the cage nuts in the corresponding drillings or spaces in the switch cabinet frame.
4.
Lift the empty rack mount frame into the switch cabinet frame and insert the fastening
screws together with the washers.
5.
Tighten the screws one after the other and then check once more that all the screws are
tight.
6.
Remove the plastic frames from both sides of each unit to be installed.
7.
Slide each unit onto the corresponding fixing plates until you feel it lock securely into
place.
4.3
VIDEOJET decoder 3000
Installation | en
13
Bosch Sicherheitssysteme GmbH
Installation Manual
2013.08 | V3 | F.01U.281.923
Содержание VJD-3000
Страница 1: ...VIDEOJET decoder 3000 VJD 3000 en Installation Manual ...
Страница 2: ......
Страница 32: ......
Страница 33: ......