28/176 Installing MDT and SLK
Bosch Rexroth AG
, MIT: ID 40, 3 842 530 344/2014-05
3.4.4
Turning on the SLK
Once the SLK has been mechanically and electrically installed, the
supply voltage
can be switched on. The SLK performs a self-test on start-up (approx. 15 sec.).
During this time, the cover on the HF head illuminates, though the status display
remains inactive. After the self-test, the status display will first show the currently
configured node number for a few seconds, followed by the “ready” signal. The light
on the HF head then turns off. The initial state after power-on is always “off”, i.e., the
HF field is off and no communication is possible with the MDT.
Fig. 13: Display showing current node number on a Profibus SLK
Fig. 14: Display showing ready
Fig. 15: Approx. 15 seconds until ready after turning on
PROOF COPy 1 | 20.05.2014 | FOR INTERNAL USE ONLy