
CONTACT US FOR A QUOTE TODAY
1-800-731-1722
WWW.IDEALSHIELD.COM
15
Power Xpress™ Dual Bollard Charge Station
Installation Guide
576414 Rev. A
CAUTION: Read all instructions before installing
the EVSE.
WARNING: Main service power must be
off and disconnected before attempting
to install the EVSE.
WARNING: The bollard weighs 20 lb per
foot, and the bottom end is significantly
heavier than the top end. Take proper
precautions and use safe lifting practices
when lifting the bollard.
1.
Place the bollard where it is to be installed and
drill holes.
2.
Install the 3/4 in. anchor bolts in accordance
with industry standards for the type of
mounting being performed
.
A
B
A. Conduit stand pipe
B. Marked locations for anchor bolts
Figure 12. Drill Holes
NOTE:
Adapters may be used to attach junction
box to stand pipe. All adapters and boxes
must be suitable for wet locations.
NOTE: Consult national and local codes for ap-
proved, service cord.
3.
Adjust charging cable strain relief to the
following locations.
•
Top unit - 7 in. from EVSE
•
Bottom unit - 24 in. from EVSE
www.pluginnow.com
POWER
STATUS
RESET
Technical Support
# 1 877 809-3873
www.pluginnow.com
POWER
STATUS
RESET
Technical Support
# 1 877 809-3873
1
2
3
4
5
6
7
8
9
10
11
13
14
15
16
17
18
19
20
21
22
23
24
25
26
A. Top Unit
B. Bottom Unit
Figure 13. Prepare Power Xpress Units
4.
Install cable gland in top of wiring chamber.
1. Remove the top plastic cover.
2.
Back out fasteners so that they do not extend
into the inside of the bollard.
3. Cut 2 lengths of service cord approximately
6.5 ft. and 8.5 ft.
A
B