GasFinder2 Operation Manual — Installation
July 17th 2017
GasFinder2
For fi xed, long path installations, a concrete column is the preferred
construction material because a steel structure may deform due to the
thermal stresses caused by differential heating.
Note:
It is very important that the
Gasfi nder2
is mounted on a structure
separate from that used by the operators.
1. Bolt the large X-Y mount to the support base with the adjusting
screws towards the operator.
2. Open the GasFinder2 carrying case and attach the alignment scope
to the channel on the top of the GasFinder2 with the thumb screws
attached to the scope (the scope end with the adjusting ring faces the operator).
3. Remove the
GasFinder2
from the case and place it onto
the X-Y mount. The rear of the
GasFinder2
locks under
the angle at the rear of the mount and the two red thumb
screws at the front of the mount lock into the holes on the
front panel of the
GasFinder2.
4. Connect the power cable between the socket on the rear of
the
GasFinder2
and the 12V power supply and connect the
power supply to a power source.
5. Connect the data cable to the DB15 connector.
Attach the enclosure to baseplate.
6. Switch on the
GasFinder2.
Details of the data protocol are given in Section 4
In the roof line of a smelter
Note that the support
for the GasFinder2
is from the roof and
is separate from the
maintenance platform
G u a r d r a i l f o r
m a i n t e n a n c e
platform
GasFinder2
Power
Supply
Data
Connection
box
Concrete Column
Support Base
Thumb
Screws
Angle Lock
Plastic enclosure
Содержание GasFinder2
Страница 52: ...9 2 Boreal Laser Inc GasFinder2 Operation Manual Appendices July 17th 2017 This page left intentionally blank...
Страница 66: ...9 16 Boreal Laser Inc GasFinder2 Operation Manual Appendices July 17th 2017...
Страница 68: ...10 2 Boreal Laser Inc GasFinder2 Operation Manual Drawings July 17th 2017 This page intentionally left blank...
Страница 69: ......
Страница 70: ...10 2 Boreal Laser Inc GasFinder2 Operation Manual Drawings August 2011 This page intentionally left blank...
Страница 71: ......
Страница 72: ...10 2 Boreal Laser Inc GasFinder2 Operation Manual Drawings August 2011 This page intentionally left blank...
Страница 73: ......
Страница 74: ...10 2 Boreal Laser Inc GasFinder2 Operation Manual Drawings August 2011 This page intentionally left blank...