background image

10

Installation - mixer

NOTE: For illustrative purposes 

only the 110 tap with cross handles 

is shown.  

Please follow the same procedure 

to install the 210 tap with lever 

handles.  

Before installing your new mixer, 

flush through the pipe work to 

ensure removal of debris, turn off 

the water supply.
Make sure the O-ring is in place in 

the underside of the mixer.
Position the mixer on the bidet. 

From the underside of the bidet 

screw the two flexible pipes to the 

hot and cold connections in the 

mixer body, the hot should be to the 

left and the cold to the right, hand 

tighten only. 
Screw the threaded rod into the 

small hole to the front of the  

mixer body.
Slide the rubber and metal washer 

over the rod, the rubber washer 

should be on top. Make sure that 

raised V part of the rubber washer 

sits in the groove of the metal 

washer. Screw on the nut and 

tighten to clamp the mixer to  

the bidet.   

CAUTION:

 Do not over tighten the 

nut as this may damage the bidet.
Connect the water supply to the 

inlet pipes. The hot water should be 

connected to the left pipe and cold 

to the right.

CAUTION:

 When 

installing the 

flexible hoses 

do 

not

 kink, or bend  

them more than 

the 60mm diameter 

as shown right.

60mm

Control 

handles

O-ring

Rubber 

washer

Metal 

washer

Nut

Hot flexible  

pipe (red)

Cold flexible  

pipe (blue)

Threaded 

rod

11

Installation - Pop-up waste

Vertical 

control 

rod

Vertical 

control rod 

extension

Horizontal 

control rod

Ball joint 

retainer

Bearing

Control 

rod link

Plug

Plug 

housing

Seal

Seal

Body

Dissemble the pop-up waste and 

reassemble onto the bidet .
Insert the vertical control rod down 

through the hole in the back of 

the spout body and screw into the 

extension rod.
Place the short end of the horizontal 

control Slide the bearing over 

control rod making surethat the 

camfer is against the ball, Screw on 

the ball joint retainer. Do not over 

tighten.
Slide the control rod link onto the 

vertical and horizontal control rods 

and loosely tighten.
Test the action of the pop-up waste 

and fully tighten the rod link. Adjust 

the control rod link as required. 

Adjust the height of the plug as 

required.
Turn on the water supply and turn 

the mixer on fully to flush through 

any possible debris from the mixer. 

Finally check all new connections  

for leaks.

Содержание AXBRIDGE BC-AXB-110-CP

Страница 1: ... AXB 210 BN INSTALLATION GUIDE This instruction booklet covers model BC AXB 110 CP BC AXB 110 BN BC AXB 210 CP BC AXB 210 BN Version 1 1 5 19 VADO Wedmore Road Cheddar Somerset England BS27 3EB tel 01934 744466 fax 01934 744345 www vado com sales vado com ...

Страница 2: ...elaws 2004 For further information contact the Water Regulations department of your local water supplier see the WRAS website www wras co uk for details or the Water Regulations Advisory Scheme by email info wras co uk or telephone 01495848454 Before making any inlet pipe connections all supply pipes MUST be thoroughly flushed to remove debris Failure to do so could result in damage or low flow fr...

Страница 3: ...g washer lock washer screw and screw cover Lever handles with spring washer lock washer screw and screw cover Cross handle option OR Lever handle option Dimensions 178mm 147mm 56mm 112mm 288mm 62mm 55mm Handle dimensions 100mm Lever handle Cross handle ...

Страница 4: ... 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 Installation Quick guide 1 2 3 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 1 2 3 4 0 5 3 5 6 4 1 60mm 2 ...

Страница 5: ...ly aligned at this stage Without forcing the handle adjust the handle and the valve together so that the handle is perfectly straight making sure you do not unscrew the valve by more than 20 Should you do so you will need to go back to the beginning of this section and start again Test the action of the handle and valve making sure that the handle is perfectly straight in the off position Remove t...

Страница 6: ...e connected to the left pipe and cold to the right CAUTION When installing the flexible hoses do not kink or bend them more than the 60mm diameter as shown right 60mm Control handles O ring Rubber washer Metal washer Nut Hot flexible pipe red Cold flexible pipe blue Threaded rod 11 Installation Pop up waste Vertical control rod Vertical control rod extension Horizontal control rod Ball joint retai...

Отзывы: