Every 10 operating hours
BOMAG
49
BW 900-2
5.10 Check the water level
Fig. 63
l
Check the water level (Fig. 63).
Fig. 64
l
Open the lid (Fig. 64) and fill in as much water
as is required, close the lid.
i
Note
If there is a risk of frost observe the special service
instructions under "water sprinkler system, main-
tenance in case of frost".
Make sure that the ventilation bore in the filler cap
is free.
5.11 Cleaning the scrapers
Fig. 65
l
Fold the scrapers up and clean them (Fig. 65).
This is of particular importance before com-
pacting asphalt surfaces.
Содержание BW 900-2
Страница 2: ......
Страница 7: ...BOMAG 7 BW 900 2 1 Technical Data...
Страница 10: ...Technical Data BOMAG 10 BW 900 2...
Страница 11: ...BOMAG 11 BW 900 2 2 Safety regulations...
Страница 18: ...Safety regulations BOMAG 18 BW 900 2...
Страница 19: ...BOMAG 19 BW 900 2 3 Indicators and Controls...
Страница 20: ...Indicators and Controls BOMAG 20 BW 900 2 Fig 5...
Страница 27: ...Indicators and Controls BOMAG 27 BW 900 2 Fig 24 No 18 Water level gauge...
Страница 28: ...Indicators and Controls BOMAG 28 BW 900 2...
Страница 29: ...BOMAG 29 BW 900 2 4 Operation...
Страница 41: ...BOMAG 41 BW 900 2 5 Maintenance...
Страница 67: ...BOMAG 67 BW 900 2 6 Trouble shooting...
Страница 71: ......
Страница 72: ......