[MBA_NKBD_EN] Rev.: 10/2015
23
No liability accepted for translation or printing errors. Subject to changes in dimensions, weights and other technical data.
All rights reserved. Modifications, reprints and photomechanical reproduction, even in extract from, require the express permission of BOGA GmbH, Werkstraße 16, D-59494 Soest.
BOGA GmbH
• Werkstraße 16 • D-59494 Soest • Fon: +49 2921 96943-0 • Fax: +49 2921 96943-29 • [email protected] • www.airwin.net
fig. 23
– Example for commissioning and restart
Definitions
*) possible cycles: 0.75 - 1.5 - 3 - 6 - 12 - 24 - 48 h (default 12 h, may be changed in the
factory upon request)
0) Humidity request OFF
1) Humidity request ON
2) Fluid tank empty
3) Fluid tank full
A) Flushing of water supply line
B) Drainage of fluid tank
Any humidification request made during the rinse operation will be ignored.