47
Step 4
Remove the paper covering on the remaining side of the eight
Round Foam Pads Orient the side with the exposed Pads to face
the back of the Inner Chuck Plate Assembly. Slip the Chuck
Pulley (L3) over the 12 mm Chuck Shaft. Slide the Plates
together being careful to keep the helical cutouts of the Chuck
Pulley and those on the Inner Chuck Plate perfectly aligned.
Then press the discs firmly together as shown.
View from the flange side showing
the alignment of the helical cutouts
for both the Inner Chuck Plate(L4)
and the Chuck Pulley (L3).
Содержание REVOLUTION
Страница 1: ...Assembly Manual Rev 2 5 Rotating Axis CNC Router REVOLUTION ...
Страница 21: ...20 1 2 3 4 ...
Страница 23: ...22 The finished Z Assembly should look like this ...
Страница 44: ...43 Chuck Assembly Required Wood Components L2 Outer Chuck Plate 1 L3 Chuck Pulley 1 L4 Inner Chuck Plate 1 ...
Страница 82: ...81 GR18 Right Gantry Side 1 GR20L GR20R Gantry Mid Vertical Support 2 ...
Страница 85: ...84 M18 M6 Lock Nut 5 H9 20 X 2 Screw 1 H45 20 Wing Nut 1 H10 20 Nut 1 H75 Spacer 1 ...
Страница 96: ...95 Completed Left Side ...
Страница 100: ...99 Completed Right Side ...
Страница 106: ...105 8d Insert the 20 X 2 inch Screw as shown 8e Place the Spacer on the Screw and snug in place with a 20 Nut ...
Страница 134: ...133 1h Connect the Z Axis Home Switch wire to the Z terminal 11 Connect the Z Axis Stepper Motor wire to the Z terminal ...
Страница 143: ...142 Completed Views Front View Back View ...
Страница 144: ...143 Left Side Right Side ...
Страница 145: ...144 Properly Wired Controller ...