92
5d
Attach the Gantry Mid Support
Assembly and Chuck Support
Assembly together with two M4 x 16
Screws and Nuts.
5e
Connect the Gantry Mid Support
Assembly to the Gantry Front
Support Assembly and secure with
two M4 x 16 Screws with Nuts.
5f
Connect the (GR14) Gantry Top
Brace to the (GR21) Gantry Back
Vertical Support and secure with
one M4 x 16 Screw with Nut.
Содержание REVOLUTION
Страница 1: ...Assembly Manual Rev 2 5 Rotating Axis CNC Router REVOLUTION ...
Страница 21: ...20 1 2 3 4 ...
Страница 23: ...22 The finished Z Assembly should look like this ...
Страница 44: ...43 Chuck Assembly Required Wood Components L2 Outer Chuck Plate 1 L3 Chuck Pulley 1 L4 Inner Chuck Plate 1 ...
Страница 82: ...81 GR18 Right Gantry Side 1 GR20L GR20R Gantry Mid Vertical Support 2 ...
Страница 85: ...84 M18 M6 Lock Nut 5 H9 20 X 2 Screw 1 H45 20 Wing Nut 1 H10 20 Nut 1 H75 Spacer 1 ...
Страница 96: ...95 Completed Left Side ...
Страница 100: ...99 Completed Right Side ...
Страница 106: ...105 8d Insert the 20 X 2 inch Screw as shown 8e Place the Spacer on the Screw and snug in place with a 20 Nut ...
Страница 134: ...133 1h Connect the Z Axis Home Switch wire to the Z terminal 11 Connect the Z Axis Stepper Motor wire to the Z terminal ...
Страница 143: ...142 Completed Views Front View Back View ...
Страница 144: ...143 Left Side Right Side ...
Страница 145: ...144 Properly Wired Controller ...