28
Step 2
Attach the SG20U Bearing Assembly.
2a
Attach and tighten the two upper SG20U Bearing
Assemblies to the Y Carriage Assembly as shown.
NOTE: The assembly order for the Upper Bearing: Machine Screw,
SG20U Bearing (with hub facing toward the Bearing Washer),
Bearing Washer, Plywood, Bearing Washer secured with a Lock
Nut.
Upper Bearing Assembly
Содержание REVOLUTION
Страница 1: ...Assembly Manual Rev 2 5 Rotating Axis CNC Router REVOLUTION ...
Страница 21: ...20 1 2 3 4 ...
Страница 23: ...22 The finished Z Assembly should look like this ...
Страница 44: ...43 Chuck Assembly Required Wood Components L2 Outer Chuck Plate 1 L3 Chuck Pulley 1 L4 Inner Chuck Plate 1 ...
Страница 82: ...81 GR18 Right Gantry Side 1 GR20L GR20R Gantry Mid Vertical Support 2 ...
Страница 85: ...84 M18 M6 Lock Nut 5 H9 20 X 2 Screw 1 H45 20 Wing Nut 1 H10 20 Nut 1 H75 Spacer 1 ...
Страница 96: ...95 Completed Left Side ...
Страница 100: ...99 Completed Right Side ...
Страница 106: ...105 8d Insert the 20 X 2 inch Screw as shown 8e Place the Spacer on the Screw and snug in place with a 20 Nut ...
Страница 134: ...133 1h Connect the Z Axis Home Switch wire to the Z terminal 11 Connect the Z Axis Stepper Motor wire to the Z terminal ...
Страница 143: ...142 Completed Views Front View Back View ...
Страница 144: ...143 Left Side Right Side ...
Страница 145: ...144 Properly Wired Controller ...