128
3a
Align the access hole in the Gantry with the Bearing
Screw. Using a 10mm socket and a Phillips
Screwdriver, tighten the Lock Nuts to secure the 4
Bearing positions.
Step 1
Installing the Makita RT0701C Router.
1a
Insert the Router into the Holder and with downward
pressure, gently twist the Router body until it is fully
seated in place in the Holder.
Содержание REVOLUTION
Страница 1: ...Assembly Manual Rev 2 5 Rotating Axis CNC Router REVOLUTION ...
Страница 21: ...20 1 2 3 4 ...
Страница 23: ...22 The finished Z Assembly should look like this ...
Страница 44: ...43 Chuck Assembly Required Wood Components L2 Outer Chuck Plate 1 L3 Chuck Pulley 1 L4 Inner Chuck Plate 1 ...
Страница 82: ...81 GR18 Right Gantry Side 1 GR20L GR20R Gantry Mid Vertical Support 2 ...
Страница 85: ...84 M18 M6 Lock Nut 5 H9 20 X 2 Screw 1 H45 20 Wing Nut 1 H10 20 Nut 1 H75 Spacer 1 ...
Страница 96: ...95 Completed Left Side ...
Страница 100: ...99 Completed Right Side ...
Страница 106: ...105 8d Insert the 20 X 2 inch Screw as shown 8e Place the Spacer on the Screw and snug in place with a 20 Nut ...
Страница 134: ...133 1h Connect the Z Axis Home Switch wire to the Z terminal 11 Connect the Z Axis Stepper Motor wire to the Z terminal ...
Страница 143: ...142 Completed Views Front View Back View ...
Страница 144: ...143 Left Side Right Side ...
Страница 145: ...144 Properly Wired Controller ...