19
Installation
Unpacking
Remove the two plastic tape and the
internal packing.
Carefully check that the unit has not
been damaged during transport. Any
signs of damage must be reported to the
forwarder immediately.
If the unit has been shipped horizontally
or at an angle, it will be necessary to wait
at least 8 hours before setting it up, in
order to allow the cooling circuit to reset
itself.
Ensure that a qualified technician
connects it to the electric supply following
the manufacturer’s instructions and
according to the local safety regulations.
The end user is not permitted to access
the internal service parts of the unit.
Only technical personnel should carry
out operations of this nature.
* Installation Fizz model. All of the operations must be
carried out exclusively by qualified technical personnel.
To view the video tutorial, scan the QR code.
Содержание ECOCHIC 150 IT
Страница 2: ......
Страница 31: ...31 Service history Installation Technician Date Notes Signature Maintenance Technician Date Notes Signature ...
Страница 33: ......
Страница 34: ......
Страница 35: ...160113 Rev 00 02 10 2017 12 53 ...