10
C
OM
M
IS
S
ION
ING
Document Front Page
0
11/04/2010
FloorHand Shop Test/ Commisioning Procedure
DT
CT
MT
Draft
10/28/1020
Issued
DT
CH
MT
Rev./Status
Date
Description
Made by
Checked By:
Approved:
Suppiler References:
Procurement References:
TAG No:
Date:
Signature:
SDRL Code:
Area:
System:
Pages:
Encl:
Company:
Document Title/ Equipment:
Commissioning Check Sheet for FloorHand
(Iron Roughneck)
Rig/Vessle/Customer Order:
Equipment Serial No:
Supplier:
Blohm + Voss Oil Tools, LLC
Document No:
Содержание 9PU-7200
Страница 5: ...5 DESCRIPTION DESCRIPTION ...
Страница 9: ...9 COMMISSIONING COMMISSIONING ...
Страница 14: ...14 INSTALLATION INSTALLATION ...
Страница 17: ...OPERATIONS 17 OPERATIONS ...
Страница 22: ...MAINTENANCE INSPECTION 22 MAINTENANCE INSPECTION ...
Страница 24: ...24 SPARE PARTS SPARE PARTS ...
Страница 26: ...26 DRAWINGS DRAWINGS ...
Страница 27: ...27 DRAWINGS Figure 9 ...
Страница 28: ...28 DRAWINGS Figure 10 ...
Страница 29: ...29 DRAWINGS Figure 11 ...
Страница 30: ...30 DRAWINGS Figure 12 ...
Страница 31: ...31 DRAWINGS Figure 13 ...
Страница 32: ...32 DRAWINGS Figure 14 Figure 15 ...
Страница 33: ...33 DRAWINGS Figure 16 ...