BLiss tuBs
save these instructions
15
© 2015 - 2017 Bliss Walk-in Bathtubs. All Rights Reserved.
•
Once the tub is in the correct position, the frame is level side to side and front to back, and all feet are
touching the ground, lock down the locking nuts on the bolts holding the feet.
• Do not forget the two middle leveling feet!
2. securing to Walls & Floor
Secure the top of the tub to the wall studs by screwing through the flange or using metal strapping or brackets (not
provided; see photo on page 13). The tub feet have holes that allow them to be screwed to the wooden subfloor. For
securing the tub on concrete subfloor use bolts and steel strapping over the frame to secure the tub to the floor or use
heavy-duty masonry screws that won't loosen over time.
Both flange up tubs and flange down tubs can be adapted to any installation situation. Tubs can be installed against
existing tile, existing wall, or directly to the studs in new construction. See the next page for further details.
caution...
IN EVERY SITUATION IT IS THE CONTRACTOR’S RESPONSIBILITY TO ENSURE
A PROPER MOISURE BARRIER IS ESTABLISHED IN COMPLIANCE WITH STATE AND LOCAL
CODES.
special note
For inspection and reference purposes, UPC & UL certification labels are permanently adhered to the tub
frame behind the large access panel. Location of the label for inward-swinging door is shown below.
instaLLation
Certification labels attached here