background image

 

 

11 

 

 

4.4 

Control box 

The control box is equipped with all control elements and instruments for monitoring and controlling the 
machine.

 

 

 

 

 
 

 
 

 

 
 

 
 

 

 
 

 
 

 

 
 

 

1 + 2 + 3 

Control lamp,   push buttons “Control ON/OFF”

 

Pressing the push button “Control ON” switches the control on and makes the control lamp light up.  
Pressing the push button “Control OFF” switches the control off. 
 

Control lamp motor protection 

This red lamp lights up when the complete electronics has been switched off by overload of one of the motors. 
 

5 + 6 + 7 

Control lamp,  

push buttons “Blast wheel ON/OFF” 

Pressing the push button “Blast wheel ON” switches the blastwheel motor on and makes the white control lamp 
light up. Pressing the push button “Blast wheel OFF” cuts off the power supply immediately. 
 

Ammeter 

This meter indicates the power consumption of the blastmotor in ampere. The ammeter shows the blast 
cleaning load onto the surface. When switching on the motor the current value peaks shortly. 
The no-load current is approximately 8A. The maximum operating current is 26A / 30A. 
 

Hour counter 

Shows the number of actual working hours performed by the blastwheel. Useful for maintaining a proper 
maintenance schedule. 
 

10 

Emergency shutdown button 

Red mushroom-shaped emergency shutdown push button, this button cuts off all power to the machine.  
Turn to unlock. After use of the emergency button, all functions have to be re-started manually. 
 

11 

Main power switch 

The main power switch is located on the control box. It has to be switched OFF when connecting the machine 
to the power supply. It has to be switched ON before operating the machine. The main power switch can be 
locked in the “OFF” position by using a padlock and placing it through the main switch. 
 

12 

Abrasive control lever 

This lever is located on the right hand side of the control box. It regulates the magnetic valve to control the 
flow of abrasive towards the blast wheel. The valve is hand-operated, pull the lever towards you to open. Push 
the lever towards the machine to close.

1  Control lamp “Control” 

2  Push button “Control ON” 

3  Push button “Control OFF” 

4  Control lamp Motor protection 

5  Control lamp “Blast wheel” 

6  Push button “Blast wheel ON” 

7  Push button “Blast wheel OFF” 

8  Ammeter blast wheel 

9  Hour counter 

10  Emergency shutdown button 

11  Main power switch 

12  Abrasive control lever 

Close 

Open 

10 

11 

12 

Содержание 1-15DS

Страница 1: ...Original instructions in English language OPERATING INSTRUCTIONS 1 15DS Global VERSION 2 3...

Страница 2: ...s Repairs Cleaning Test on By Inspection before initial operation on __________________________________________ By __________________________________________ Date of initial operation ________________...

Страница 3: ...12 Driving without connected drive motor 12 4 7 Connecting the drive motor to the traction wheel 13 4 8 Driving with connected drive motor 14 4 9 Blast wheel 14 4 10 The abrasive valve 14 4 11 Separa...

Страница 4: ...n sense when working with machines 2 Machine description The Blastrac blast cleaning machine 1 15DS Global is a downward blasting machine with a closed abrasive circuit exclusively designed for the pr...

Страница 5: ...om the machine h Never use the machine when the surface is not clear and if there is a risk of stumbling or tripping i Remove electrical cables and dust hose s from the surface to be treated j Make su...

Страница 6: ...ersonal Protective Equipment while working with the machine Dust mask class FFP3 or higher Ear protection Safety glasses with lateral protection Protecting gloves Safety shoes b Dress properly Do not...

Страница 7: ...se must be connected properly with a hose clamp and industrial tape e The dust hose must be undamaged and free of obstructions f Always switch on the dust collector first 3 7 Maintenance safety a Pull...

Страница 8: ...manner that damage due to the effects of the use of force or incorrect loading and unloading is avoided i The lifting eyes can also be used to fasten the machine on a pallet or during transport j Alwa...

Страница 9: ...r a dust mask class FFP3 or higher Hearing protection is obliged Safety glasses with lateral protection are obliged CE mark on this machine Wear protecting gloves Safety shoes obliged Consult the manu...

Страница 10: ...h the current legal regulations and directives in force this applies to the protective earth conductor in particular in order to ensure that all safety devices are functioning and to eliminate possibl...

Страница 11: ...ng hours performed by the blastwheel Useful for maintaining a proper maintenance schedule 10 Emergency shutdown button Red mushroom shaped emergency shutdown push button this button cuts off all power...

Страница 12: ...areful Make sure nobodies feet get under the wheels Wear appropriate safety shoes when you drive the machine to or from the work area Make sure that no vehicles such as forklift trucks and other equip...

Страница 13: ...mum speed The FORWARD button is used to drive forward press and hold the button to do so WARNING Do not drive forward while blasting This function is only used for maneuvering without blasting Make su...

Страница 14: ...The valve is hand operated by the abrasive control lever This lever is located on the control box and can be adjusted so that any quantity of abrasive can be fed to the blastwheel Optimum blast clean...

Страница 15: ...timum functionability of the machine The adjustment is done using the 4 setting screws one each at the rear wheels and one at the front drive wheel bracket below the control box The height of the brus...

Страница 16: ...till of all drives Open the control box of the machine Set the inverter switch to the opposite position Close the control box and check the turning direction of the motor again 5 3 Switching the machi...

Страница 17: ...ng speed can be found out by observing the blasted surface and varying the speed during the blast cleaning process Slight profiling on concrete requires a higher speed than coarse profiling 6 10 Blast...

Страница 18: ...tant factor to obtain an optimum blast pattern Each control cage has a lateral window The position of the window determines where the abrasive is fed onto the blast wheel blades and where it hits the...

Страница 19: ...accessible screw connections for tight seat Every 3 hour Check the separator tray the hopper the feed spout and blast wheel unit for foreign matter and large contaminants Daily and prior to starting...

Страница 20: ...s drives secure the machine against unintentional switching on Put the machine to its safety off position The machine is in a safe condition when it cannot generate any hazard Further is advised Clean...

Страница 21: ...the blastwheel coverplate is released from the blasthousing Block the blastwheel 7 and remove the central fixing bolt 6 Take the blastwheel 7 out of the housing and check the hub 8 for wear Use a new...

Страница 22: ...them out at the bottom of the housing To mount the liners keep on the following sequence Prior to mounting the liners check all threads for contaminants and clean them if necessary First place the ple...

Страница 23: ...drives have to be checked every 3 months 6 4 V belt mounting Reduce the distance between the driving motor and the bearing to release the tension of the V belt drive Carefully put the V belt in the gr...

Страница 24: ...m between the chain wheels Fitting the chain Before mounting the chain it must be degreased to prevent any abrasive or abrasive particles from adhering The chain is supplied as a chain string and has...

Страница 25: ...ng of smooth concrete or natural stone removes coatings with a thickness of 1 3 mm cleaning of steel surfaces Media nr 5 Abrasive S460 This media is used to create a coarse profile or to increase the...

Страница 26: ...tment of the magnetic valve Shocked blast wheel At the start of the blast process too much abrasive at once hits the wheel The travel speed is too high Clean wire mesh top up abrasive if necessary Abr...

Страница 27: ...drive Blast wheel motor does not switch on Motor protection switch has triggered Check and switch on again Check the mains power supply Blast wheel motor switches off during operation Safety fuse or...

Страница 28: ...ve relais CHECK Is the supply cable plugged in the wall socket generator Is the supply cable plugged in the socket of the BDC and is the BDC switched on see manual of BDC Is the main switch turned on...

Страница 29: ...d also take in account the times when the machine is switched off or even running but not actually in use This may significantly decrease the exposure level over the total working period Identify addi...

Страница 30: ...gton Sheffield South Yorkshire GB S25 3QY England Tel 0044 1909 56 91 18 Fax 0044 1909 56 75 70 Info blastrac co uk Blastrac Germany Richard Byrd Stra e 15 D 50829 K ln Ossendorf Tel 0049 221 70 90 32...

Отзывы: