background image

15

Maintenance

Blast Wheel Removal and Installation

When the blades on the blast wheel are deteriorated by 50% or more, then the blast wheel should
be replaced. To replace the blast wheel, perform the following steps:

1. Verify that the control switch is in the OFF position.
2. Verify that the power cord is NOT plugged into an electrical outlet.
3. Verify that the shot valve is closed.
4. Loosen all nuts and clamps that secure the feed spout and the control cage.
5. R e m o v e t h e fe e d s p o ut.
6. R e m o v e t h e co nt ro l ca ge .
7. Mark plate with ink pen where control cage openings appear to aid in realignment.
8. Remove the four sets of nuts and washers securing the control cage assembly to the

housing.

9. Re mov e t he co nt rol c ag e assembl y.
10. Remove the arbor nut and the blast wheel.

11. Check the wheel hub for wear and replace when necessary.
12. Install the new blast wheel and the arbor nut.
13. Reattach the control cage assembly that was previously removed.
14. Insert the new control cage that was provided with the blast wheel kit. Spin the blast

wheel by hand to verify that the blast wheel and the control cage do not come into contact
with one another. Openings of control cage should be set at approximately 10:30 and
8:30.

15. R e a t t a c h t h e f e e d s p o u t
16. Verify that all nuts are tight and secure
17. Briefly activate the grinder motor to verify good balance and proper clearance.

Note: Only blast wheels manufactured by BlastPro Manufacturing, Inc. should be used by
the BP-9410V. Other blast wheels that have not been tested by BlastPro Manufacturing,
Inc. could result in damage to the equipment or injury to the operator.

Содержание BP-9-110v

Страница 1: ...STARTUP 6 SAFETY OPERATION PROCEDURES 7 SAFETY SHUT DOWN PROCEDURES 8 SAFETY MAINTENANCE PROCEDURES 9 CHECK LIST 10 OPERATING INSTRUCTIONS 11 SETTING THEBLASTPATTERN 11 TRANSPORTATION 13 WEAR PARTS 14...

Страница 2: ...VIDUALS RESPONSIBLE FOR OPERATION MAINTENANCE OR SERVICE OF THE EQUIPMENT The individuals responsible for operating maintaining and servicing the equipment should thoroughly understand and follow all...

Страница 3: ...ast wheel at a very high rate of speed which causes the shot to be thrown through an opening in the control cage and down onto to the concrete surface that is being cleaned Due to the high rate of spe...

Страница 4: ...ations relating to the use of portable tools on construction sites These statutory requirements standards and regulations are posted on the OSHA website at www osha g ov The operator and maintenance p...

Страница 5: ...ds dust masks ear plugs hard hats steel toed work boots long sleeved shirts tight fitting clothing and gloves It is also imperative for staff to tie back long hair and to remove all jewelry Work area...

Страница 6: ...all screws and other fasteners are tight Check the shot storage hopper the feed spout and the blast wheel parts for foreign bodies and remove them if present Check the blast wheel blades control cage...

Страница 7: ...tioning and to eliminate possible damage to electrical components Safety Operation Procedures When operating the BP 9 1 10V perform the following safety procedures SUPPORT PERSONNEL MUST KEEP A SAFE D...

Страница 8: ...tting down the BP 9 1 10V always perform the following safety procedures Shut off the shot supply by pushing the shot valve handle down Advance the machine until you are sure that no deep holes are be...

Страница 9: ...y a licensed electrician When performing electrical servicing work make certain that all replacement electrical components comply with the original parts and are correctly adjusted All other repairs m...

Страница 10: ...e switch on the BP 9 1 10V and the dust collector to the ON position for two minutes so as to verify that the circuit breaker will not trip 10 Disconnect the hose from the BP 9 1 10V to verify that th...

Страница 11: ...trial and error The importance of selecting the proper blast pattern cannot be overemphasized An improper or unevenly distributed blast pattern results in excessive blasting on either the right or le...

Страница 12: ...n The hot spot should be in the center of the width blasted The hot spot can be altered by rotating the control cage Rotating the control cage in a counter clockwise direction will move the hot spot t...

Страница 13: ...excessive force or of using incorrect loading and unloading procedures Before transportation the BP 9 1 10V should be separated into machine filter unit and general accessories Note Personnel must rem...

Страница 14: ...Shot Hopper 30 hours Warping or thin spots Feed Spout 50 hours Thin spots Blast Wheel 10 hours Blades deteriorated 50 Control Cage 10 hours Deteriorated edges Blast Wheel Hub 10 hours Missing pins de...

Страница 15: ...trol cage assembly 10 Remove the arbor nut and the blast wheel 11 Check the wheel hub for wear and replace when necessary 12 Install the new blast wheel and the arbor nut 13 Reattach the control cage...

Страница 16: ...16 BP 9 110V Drawing...

Страница 17: ...rol Cage Bracket BT976324 9 Control Cage BT451476 1 0 F e e d S p o u t Included with Item 12 1 1 F e e d S p o u t H o s e Included with Item 12 1 2 S h o t V a l v e BTP000001 1 3 S i d e B r u s h...

Страница 18: ...m BP 9 1 10V is creating excessive wear on liners and blast housing Possible Solution Adjust control cage so that the hot spot is centered in work area rather than on liners or housing Problem BP 9 1...

Страница 19: ...en make additional passes over the floor surface Problem BP 9 1 10V or dust collector is emitting concrete dust Possible Solution Verify there are no holes in the duct hose leading from the BPS 110V t...

Отзывы: