After both linkages are completed. connect both of
the aileron servo loads using a Y-harness you have
purchased.
Insert the 90 degree bend down through the hole in the
control horn. Install one nylon snap keeper over the
wire to secure it to the control horn. Install the control
horn retaining screw and remove the masking tape
from the aileron.
3. INSTALLING THE CONTROL HORNS, LINKAGES
A+B
glue
Epoxy
* Attach the clevis to the outer hole in the servo
arm. Install a silicone tube on the clevis.
*
Using pliers, carefully make a 90 degree bend
down at the mark made. Cut off the excess wire,
leaving about 6mm beyond the blend.
Bend and cut.
Silicone Tube
BUCKER BU 131 JUNGMANN
Item code: BH160
4. INSTALLING THE ENGINE MOUNT
There are two options:
1. Electric motor
2. Engine mount.
OPTION 1: ELECTRIC MOTOR
M2
2mm hNut
100mm Push rod
- - 4
- - - 4
- - 4
- - - - -
Horn
- - - 4
- - 4
Flaslink
- - - - - 4
5mm Silicone Tube
Servo arm
Silicone Tube
Flaslink
Push rod
Horn
- - - - - - - 4
10x50mm Aluminum
- - - - - - - 4
10x15mm Aluminum
4mm Washer
- - - - - - - 8
4mm Spring Washer
- - - - - - - 8
Mount Nut
- - - - - - - 4
4 x 30mm Cap Screw
- - 4
- - - - -
- - - 4
4 x 70mm Cap Screw
6