12
HAWKER HURRICANE Item code: BH147
.
Instruction Manual
3)
Now, remove the vertical stabilizer and using
a modeling knife, carefully cut just inside the marked
lines and remove the film on both sides of the vertical
stabilizer. Just as you did with the horizontal stabilizer,
make sure you only press hard enough to cut the film,
not the balsa vertical stabilizer.
Mark line
A/B Epoxy glue
Remove
the covering.
4)
Slide the vertical stabilizer back in place. Using
a triangle, check to ensure that the vertical stabilizer is
aligned 90 degree to the horizontal stabilizer.
5)
When you are sure that everything is aligned
correctly, mix up a generous amount of 30 minute ep-
oxy. Apply a thin layer to the slot in the mounting plat-
form and to the vertical stabilizer mounting area. Set
the stabilizer in place and re-align. Double check all of
your measurements one more before the epoxy cures.
Remove any excess epoxy using a paper towel and
rubbing alcohol and hold the stabilizer in place with
T-pins or masking tape. Allow the epoxy to fully cure
before proceeding.
RUDDER CONTROL HORN INSTALLATION
Rudder control horn install as same as method of
elevator control horn.
RUDDER PUSHROD INSTALLATION
Rudder pushrod install as same as the way of elevator
pushrod. Please see pictures below.
Control horn
Bottom side
2. Push in
1. A+B Epoxy glue
2)
Slide the vertical stabilizer into the slot in the
mounting platform in the top of the fuselage. Mark the
shape of the fuselage on the left and right sides of the
vertical stabilizer using a felt-tip pen.
Rudder pushrod
Rudder
control horn
Rudder servo
Snap keeper
Rudder pushrod
Flaslink
Pushrod wire
servo arm