Manageable Gigabit Switch
Installation
This chapter gives step-by-step instructions about how to install the LBG1000A switch:
Selecting a Site for the Switch
As with any electric device, you should place the LBG1000A switch where it will not be subjected to extreme
temperatures, humidity, or electromagnetic interference. Specifically, the site you select should meet the following
requirements:
-
The ambient temperature should be between 32 and 104 degrees Fahrenheit (0 to 40 degrees Celsius).
-
The relative humidity should be less than 90 percent, non-condensing.
-
Surrounding electrical devices should not exceed the electromagnetic field (RFC) standards for IEC 801-3,
Level 2 (3V/M) field strength.
-
Make sure that the switch receives adequate ventilation. Do not block the ventilation holes on each side of
the switch or the fan exhaust port on the rear of the switch.
-
The power outlet should be within 1.8 meters of the switch.
User’s Manual
24
Содержание LBG1000A
Страница 8: ......
Страница 62: ...Manageable Gigabit Switch User s Manual 62 ...
Страница 70: ...Manageable Gigabit Switch AGING TIME Step 1 Move to highlight Aging Time and press Enter User s Manual 70 ...
Страница 73: ...Manageable Gigabit Switch User s Manual 73 ...
Страница 75: ...Spanning Tree Functions Move to highlight Spanning Tree from Advanced Management screen and press Enter ...
Страница 85: ...Manageable Gigabit Switch Step 4 Press Esc when completed with selecting ports User s Manual 85 ...
Страница 141: ...Manageable Gigabit Switch Emissions FCC part 15 Class A CE Mark Class A VCCI Class A User s Manual 141 ...