18
Figure 3.2
Channel Configuration Screen
Figure 3.3
Extension Modules
•
Connect the cable using unlocking levers
•
Connect the cable on the DAS240-BAT (must be powered off first)
•
Switch on the unit.
Note:
The unit is delivered with a 70 cm cable.
3.4 Measurement Connections
Using the terminal blocks provided with the unit.
. (Phoenix Contacts: SMSTB 2,5/3-ST5,08 - 1826296)
3.4.1 Voltage Measurement
Voltage measurement is performed between the + and - terminals of the inputs. The “GND” terminal is not used.